ML20247G275

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-482/OL-88-02 of Exam Administered During Wk of 881128
ML20247G275
Person / Time
Site: Wolf Creek 
Issue date: 03/27/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20247G280 List:
References
NUDOCS 8904040186
Download: ML20247G275 (2)


Text

,_-

A MAR 271989

.In Reply Refer To:

Docket:

STN 50-482/0L 88-02 Wolf Creek Nuclear Operating Corporation ATTN: Bart D. Withers President and Chief Executive Officer P.O. Box 411 Burlington, Kansas 66839 Gentlemen:

SUBJECT:

EXAMINATION D ORT, WOLF CREEK GENERATING STATION (WCGS)

During the week of November 28,'1988, the NRC administered examinations to employees of your company who had applied Tcr licenses to operate your WCGS facility. At the cor.clusion of the examination, the examination questions and preliminary findings were discussed with those members.of your staff identified in the enclosed report. One reactor operator (RO) applicant-(17. percent) and seven senior reactor operator (SRO) applicants (78 percent) passed all portions.

of the examination and have been issued the appropriate licenses..

Candidate perfomance on the written examination, especially for the R0 candidates was much lower than anticipated. When we transmitted these results to your training staff, we requested that WCGS review your candidates' performance on this set of examinations to determine the cause(s) and actions necessary to prevent recurrence. On March 20, 1989, the NRC staff met with WCGS personnel to review this analysis. The results of that meeting are documented in the enclosed report.

- Should you have any questions concerning this -letter or the enclosed report, please contact us.-

Sincerely, O'

AJ hw%

T.

p L. J. Callan, Director Division of Reactor Projects

Enclosure:

Appendix - Examination Report 60-498/0L 88-02 w/ attachments cc w/ enclosure:

Wolf Creek Nuclear Operating Corporation ATTN: Otto May~ nard, Manager of Licensing P.O. Box 411 h

Burlington, Kansas 66839 RIV:0LS

  • C:0LS*

D:DRS*

D:0RPb DGraves/lb JLPellet JLMilhoan LJCallan

/ /89

/ /89

/ /89 3 / 9/89 k

/

  • Previously concurred 8904040186 890327 PDR ADOCK 05000482 V

PDC

_1____

Wolf Creek Nuclear Operating ;

Wolf Creek Nuclear Operating Corporation ATTN: Gary Boyer, Plant Manager P.O. Box 411 Burlington, Kansas 66839' Kansas Corporation Commission ATTH:

Robert D. Elliott, Chief Engineer Fourth Floor. Docking State Office Building Topeka, Kansas-66612-1571 Wolf Creek huclear Operating Corporation ATTN: James A. Zell, Manager Nuclear Training

.P. O. Box 411 Burlington, Kansas 66839 Wolf Creek Nuclear Operating. Corporation ATTN: James Gilmore, Supervisor Licensed Training;

'P. O. Box 411 Burlington, Kansas 66839 Kansas Radiation Control Program Director bectoDMB(IE42) bec.distrib. by RIV:

RRI R. D. Martin, RA Section Chief (DRP/D)

DRP RPB-DRSS R. DeFayette, RIII RIV File SRI, Callaway, RIII MIS System J. L. Pellet

  • Project Engineer, DRP/D LFMB - Facilities Section
  • DRS D. Graves
  • D. V. Pickett, NRR Project Manager (MS:

13-D-18)

D. Graves Reading File

_-_