MAY l 71989 In Reply Refer To:
Docket: 50-285/88-37 Omaha Public Power District ATTN: Kenneth J. Morris, Division Manager Nuclear Operations 1623 Harney Street Omaha, Nebraska 68102 Gentlemen:
This responds to your letter of May 1,1989, which provided additional information which clarified your response to Notice of Violation 285/8837-01.
Previous correspondence on this subject were our Inspection Report and Notice of Violation, dated November 7, 1988; your response dated December 9, 1988; our response and request for additional information, dated January 12, 1989; your supplemental response, dated February 13, 1989; and our response dated February 24, 1989.
Your additior,al, unsolicited response was appropriate, and we shall factor the information provided into our review of your actions during a future inspection.
Sincerely,
/s/(E7 BAKGR O9 L. J. Callan, Director Division of Reactor Projects cc:
Fort Calhoun Station ATTN:
W. G. Gates, Manager P.O. Box 399 Fort Calhoun, Nebraska 68023 Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, DC 20036 Nebraska Radiation Control Program Direct r
/
RIV:RI:MQPS*
C:MQPS*
D:
D[RP WMcNeill/cjg IBarnes JLMill oan LJCallan
/ /89
/ /89 f/d/89 6 /g1 /89
- previously concurred l
gyp'5300187 890517 I
ADOCK 05000ggy l
g l
PNU t
l
Omaha Public Power District bcc to DMB (IE01) bec distrib. by RIV:
R.D. Martin, RA RPB-DRSS Section Chief (DRP/B)
MIS System RIV File DRP RSTS Operator Project Engineer (DRP/B)
Lisa Shea, RM/ALF DRS P. Milano, NRR Project Manager (MS:
13-D-18)
RRI W. McNeill I. Barnes l
l l
l l
l l
l l
!*,, *\\
74 y. gg. 4 y -
7,
- ,y..-
Omaha Public Power District
~
1623 Her:1ey Oitidtid. Nebrdshd 68102-22471"S b^ j '
~
QL 402/536-4000 n
ti MAY 4
~
11
~
May 1, 1989
~
LIC-89-433 V. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington, DC 20555
References:
1.
Docket No. 50-285 2.
Letter from NRC (L. J. Callan) to OPPD (K. J. Morris) dated November 7, 1988 3.
Letter from OPPD (K. J. Morris) oo NRC (Document Control Desk) dated December 9, 1988 (LIC-88-1089) 4.
Letter from NRC (L. J. Callan) to OPPD (K. J. Morris) dated January 12, 1989 5.
Letter from OPPD (K. J. Morris) to NRC Document Control Desk) dated February 13, 1989 (LIC-89-179)
Gentlemen:
SUBJECT:
Request for Additional Information Concerning Clarification of Response to Notice of Violation 285/8837-01 Omaha Public Power District (0 PPD) responded to Notice of Violation 285/8837-01, Failure to Maintain Traceability of Measuring and Test Equipment (M&TE) in Reference 3.
Reference 4 requested additional information needed to clarify our response.
As stated in our response, OPPD based the conclusion that the conditions identified by the inspector were isolated events on prior reviews and interviews with individuals involved in use of M&TE.
OPPD had no evidence to the contrary at that time.
In Reference 5, OPPD committed to the review of 50 Surveillance Tests conducted between the dates of January 1988 and October 1988 to verify that test equipment used was properly calibrated and recorded in the Instrument and Control (I&C) shop logs, and to confirm that the cases identified were isolated.
In accordance with Reference 5, OPPD has completed its initial review of Surveillance Tests.
Contrary to the initial indication that this was an isolated csse the review showed that additional measures need to be taken to ensure traceability of M&lE.
In response to this finding, and concurrent with other previously made commitments, JPPD developed a review plan to determine the scope of this problem as follows:
,& W
(^ Q ^
?
){f'
_ __N " __
""*'""*"A*32f/ *"""""
J
l
..l.h, V. S. Nuclear Regulatory Commission LIC-89-433 Page 2 A.
Review additional Surveillance Tests B.
Review M&TE calibration records C.
Review M&TE Deficiency Reports D.
Review M&TE Procedures E.
Conduct interviews with Technicians from the Instrumentation and Control (I&C) group This plan will allow OPPD to determine the scope of the problem and additionally the plan will be used as a basis for defining the corrective actions required to prevent recurrence.
After completion of the plan, ar.d when the extent of the problem is known, OPPD will forward the identified corrective actions, along with a schedule for completion to the NRC.
This will be submitted by June 15, 1989.
Pending the outcome of this review, OPPD has instituted the following l
compensatory actions:
A.
Held an Instrumentation and Control (I&C) group meeting to delineate the requirements of the involved procedures.
B.
Wrote and posted a memo to Instrumentation and Control (I&C) personnel specifying the logout of all M&TE equipment.
C.
Contracted a full-time person responsible for issuing M&TE.
This individual does not report to the Instrumentation and Control (I&C) group.
D.
Ordered double dutch doors to prevent general access to M&TE by Instrumentation & Control (I&C) personnel.
Please contact us if you have any questions concerning this matter.
Sincerely, A
/ K. J. Morris
/ Division Manager
(
Nuclear Operations KJM/jak c:
LeBoeuf, Lamb, Leiby & MacRae R. D. Martin, NRC Regional Administrator P. D. Milano, NRC Project Manager P. H. Harrell, NRC Senior Resident Inspector A