ML20247F361
| ML20247F361 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 03/10/1989 |
| From: | Mccoy F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kingsley O TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19302D780 | List: |
| References | |
| NUDOCS 8904030419 | |
| Download: ML20247F361 (2) | |
See also: IR 05000259/1989001
Text
_.
- _ - - _ _ _ - _ _ . _ _ _ _ - - _ - - _ _ _ _ _ _ _ _ . _ _
. . - . _ .
. _ _ - . - - _ . - - _ _ . - .
_
_
.- - _ - -
.
..
..
.
4
'
-
..
ows
MApER;AL TRANSMITTED HEREWITH
og
jo
CoNTAINS 2.790 INFoRMATION
.
4
Docket Nos. 50-259, 50-260, 50-296
License Nos. DPR-33, DPR-52, DPR-68
Mr. Oliver.D. Kingsley, Jr.
Senior Vice President, Nuclear Power
Tenrassee Valley Authority
6N 38A Lookout. Place
1101 Market Street
Chattanooga, TN 37402-2801
Dear Mr. Kingsley:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-259/89-01, 50-260/89-01, AND
~50-296/89-01
This refers' to the Nuclear Regulatory Commission (NRC) inspection conducted
by G. A. Todd on January 9-10, 1989.
The inspection included a review of
activities authorized for your Brwns Ferry facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed Inspection Report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure. Therefore, the enclosure
to this letter with the exception of the report cover page, which presents a
nonexempt summary, will not be placed in the NRC Public Document Room.
Should.you have any questions concerning this letter, please contact us.
Sincerely,
'
G904030419 890310
ADOCK 05000269
Q
PNU:'
Frank R. McCoy, Assistant Director
for TVA Inspection Programs
TVA Projects Division
Office of Nuclear Reactor Regulation
Enclosure:
(See page 2)
'
MATERIAL TRANSMITTED HEREWITH
CONTAINS 2 790 INFof MADoN
f 03
__
_ - __
- _ _ _ _ _ _ _ _ _ _ -
_.
_ _ _ _ _ - _ . _ _ _ _ - _ _ _ _ . _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ .
' -
. . - -
,
c.
.
pga101M
.
-
MATERIAL TRANSMITTED HEREWITH
>
coNTAINs 2 790 INFORMATION
Mr. Oliver D. Kingsley, Jr.
2
.
Enclosure:
-NRC Inspection Report
(Exempt from Disclosure)
l'
cc w/ enc 1:
'
J. A. Kirkebo, Vice President,
1
Nuclear Engineering
l
C. C. Mason, Acting Site Director
Browns Ferry Nuclear Plant
R. L. Gridley, Director
Nuclear Safety and Licensing
P. Carier, Site Licensing Manager
G. Campbell, Plant Manager
TVA Representative, Rockville Office
General Counsel, TVA
bec w/ enc 1:
NRR/DRIS/SB
B. Murrary, RIV
Document Control Desk (RIDS IE02), 016
bec w/ Inspection Summary:
State of Alabama
l
RII
-( /~
WW/
RII
R%
am
GTodd:er
EMcAlpine
WC1
Alohnson4
03/9 /89
03/ 9 /89
03/ /89
03//9/89
,
M AT ERIA Tr.ANSMITTED HEREW'TH
cONTAIN 2.790 INFORM ATION