ML20247F340
| ML20247F340 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 03/16/1989 |
| From: | Linda Watson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20247F334 | List: |
| References | |
| 50-327-89-05, 50-327-89-5, 50-328-89-05, 50-328-89-5, NUDOCS 8904030412 | |
| Download: ML20247F340 (2) | |
Text
r
's 1
1 ENCLOSURE 1 l
Tennessee Valley Authority Docket Nos. 50-327, 50-328 Sequoyah Units 1 and 2 License Nos. DPR-77, DPR-79 l
During the Nuclear Regulatory Commission (NRC) inspection conductea on January 30 - February 3,1989, a violation of NRC requirements was identified.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1588), the violation is listed below:
10 CFR 20.201(b) requires each licensee to make or cause to be made such surveys as (1) may be necessary for the licensee to comply with the regulations in 10 CFR Part 20 and (2) are reasonable under the circumstances to evaluate the extent of radiation hazards that may be present.
Technical Specification 6.12.1 requires in lieu of the " control device" or
" alarm signal" required by Paragraph 20.203(c)(2) of 10 CFR 20, each high radiation area in which the intensity of radiation is greater than 100 mrem /hr but less than 1,000 mrem /hr shall be barricaded and conspicuously posted as a high radiation area and entrance thereto shall be controlled by requiring issuance of a Special Radiation Work Permit.
Any individual or group of individuals permitted to enter such aieos shall be provided with or accompanied by one or more of the following:
a.
A radiation monitoring device which continuously integrates the radiation dose rates in the area.
b.
A radiation monitoring device which continuously integrates the dose rate in the areas and alarms when a preset integrated dose is received.
c.
An individual qualified in,adiation protection procedures who is equipped with a radiation dose rate monitoring device.
Contrary to the above, the licensee failed to perform radiation surveys l
necessary to evaluate the extent of radiation hazards present and entered the high radiation areas violating Technical Specification 6.12.1 requirements in that; on February 2,1989, two auxiliary unit operators entered a pipe chase on Unit 2, elevation 690, on a standing general radiation work permit, where radiation levels of 3,500 mrem /hr contact on piping and 750 mrem /hr general area gamma dose rates existed.
The AUO's did not have an integrating dose rate device, or an integrating dose rate device that alarms when a preset integrated dose is received, or an individual qualified in radiation protection, equipped with a dose rate device to provide positive control or perform radiation surveys.
8904030412 890316 PDR ADOOK 05000327 O
PNU
s Tennessee Valley Authority Docket Nos. 50-327, 50-328 Sequoyah Units 1 and 2 2
License Nos. DPR-77, DPR-79 This is a Severity Level IV violation (Supplement IV).
Pursuant to the provisions of 10 CFR 2.201, Tennessee Valley Authority is hereby required to submit a written statement or explanation to the Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555, with a copy to the Associate Director for Special Projects, Nuclear Reactor Regulation, and a copy to the NRC Resident Inspector, within 30 days of the date of the letter transmitting this Notice.
This reply should be clea' ly marked as a " Reply to a Notice of Violation" and should include:
(1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been taken and the results achieved, (4) the corrective steps which will be taken to avoid further violati^ns, and (5) the date when full compliance will be achieved.
Where good cause is shown, consideration will be given to extending the response time.
If an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.
FOR THE NUCLEAR REGULATORY COMMISSION l
[1;3,fv d/4 8 m Linda J.
atson, Acting Assistant Director for Inspection Programs TVA Projects Division Office of Nuclear Reactor Regulation Dated at Atlanta, Georgia this /L/A day of March 1989
)
i
- _ _ _ _ _ _ _ _ - _ - _ _ - _ _ _ - - - - - - _ - - _ - - - - _ - _ _ _ _ _ - - _ _ - = - - _ - -
.