ML20247E697
| ML20247E697 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 03/17/1989 |
| From: | Linda Watson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kingsley O TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20247E703 | List: |
| References | |
| NUDOCS 8904030215 | |
| Download: ML20247E697 (2) | |
See also: IR 05000259/1988035
Text
. ..
. . . ~
'
a . ,
'
.., . Q, .
.j
V ' * ,
P
.
. .
..
e
f
MAR 171989
f
Docket Nos..- 50-259,.50-260, 50-296
j
License Nos. DPR-33, DPR-52, DPR-68
r
' Mr. Oliver D. Kingsley, 'Jr.
Senior Vice President, Nuclear Power
Tennessee Valley Authority
6N 38A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Dear'Mr.'Kingsley:
SUBJECT:
NRC INSPECTION REPORT.NOS. 50-259/88-35, 50-260/88-35, AND
.
. 50-296/88-35
.
This refers to the Nuclear Regulatory Commission (NRC) . inspection conducted
by D. R. Carpenter on December 1-31, 1988.
The inspection included a review of
activities authorized for your Browns Ferry facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection included operational safety verification,
- surveillance observation, system return to service, reportable occurrences,
restart test program, follow-up of NRC Bulletins, follow-up of open inspection
items, and licensee action on previous enforcement matters.
Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
Please note that two unresolved items are identified in the inspection report.
These matters will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
'
will be placed in the NRC Public Document Room.
).
8904030215 890317
p
l
ADOCK 05000259
i
G
PNU:
I
!
I l
"'
-
---
- - - - .
b
,_
-
,
..
,
..
. . ,
,
MAR 171989
.-
.
'
Oliver D. Kingsley, Jr.
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
bA
f
L) k
L
Linda J. Watson, Acting Assistant
Director for Inspection Programs
TVA Projects Division
Office of Nuclear Reactor Regulation
Enclosure:
NRC Inspection Report
cc w/ encl:
F. L. Moreadith, Vice President,
Nuclear Engineering
0. J. Zerinque, Site Director
Browns Ferry Nuclear Plant
R. L. Gridley, Director
Nuclear Safety and Licensing
P. Carier, Site Licensing Manager
G. Campbell, Plant Manager
TVA Representative, Rockville Office
General Counsel, TVA
State of Alabama
bec w/ encl:
D. M. Crutchficid, NRR
B. D. Liaw, NRR
S. C. Black, NRR
R. C. Pierson, NRR
G. E. Gears, NRR
D. Moran, NRR
W. S. Little, NRR/RII
A. H. Johnson, NRR/RII
J. Rutberg, OGC
l
NRC Resident Inspector
NRC Document Control Desk
NRR/RII
QWk
'
WLittle:er
,
03//]/89
i
_ _ _ _ _ _ . _ _ _ _ _ _ _ . _ . _ _ _ . _ __