Requests That Util Provide Supplemental Response within 30 Days of Receipt of Ltr Re Controls That Ensure Unreviewed Question Determination & Design Change Properly Address All Aspects of Plant Operational Control Process,Per
ML20247D731
Person / Time
Site: Sequoyah  
Issue date: 03/09/1989
From: Mccoy F
Office of Nuclear Reactor Regulation
To: Kingsley O
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8903310199
Download: ML20247D731 (2)


Text

_

^

/

MAR 0 91999 Docket Nos. 50-327, 50-328 License Nos. DPR-77, DPR-79 Mr. Oliver D. Kingsley, Jr.

Senior Vice President, Nuclear Power Tennessee Valley Authority 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

Dear Mr. Kingsley:

SUBJECT:

REPORT NOS. 50-327/88-43 AND 50-328/88-43 Thank you for your response of January 3,1989, to our Notice of Violation issued on November 1,1988, concerning activities conducted at your Sequoyah facility.

The controls over the unreviewed safety question determination (USQD) assumptions in your response dated January 3,1989, do not address the issue at hand.

j l

Specifically, the USQD review process and the DCN approval process can be l

performed by different groups in a parallel effort.

For the example cited, the inspector held discussions with the parties who performed the USQD as well as j

the DCN and it appeared that the two efforts were not as well coordinated as your response indicated.

At the time of the inspection, the Sequoyah Reactor Engineer agreed that although you were fortuitous to be covered by adequate procedural controls in the specific example cited, it was not apparent that these controls would have been in place as a result of the DCN or USQD process.

Furthermore, subsequent to receipt of your letter, we reviewed current revisions of NEP 6.6 titled 10 CFR 50.59 Safety Evaluations, NEP 6.2 titled Design Change Notice, NEP 6.3 titled Operating Plant Modifications, and NEP 6.4 i

titled Plant Modifications Packages and could not find any specific controls to 1

ensure that the basis for the USQD or modification package is properly bounced.

j t

Therefore, you are requested to provide a supplemental response within 30 days

}

of the date of this letter that will clearly indicate your controls to ensure l

that the USQD and design change properly address all aspects of the plant i

operational control process.

l I

}

8903310199 890309 PDR ADOCK 05000327:

O PNU ;

j(

\\

\\

ZEoj

.s.... 1#

- y csW

- MAR o 91989:

1..

' I 11ver D. ' Kingsley, ~Jr.

O 2-u.

f We appreciate your' cooperation.in this matter.

Sincerely, h

Mf &U$$w

- Frank R. McCoy,. Assistant' Director for_ Inspection' Programs TVA Projects D_ivision Office of. Nuclear Reactor Regulation cc:

F..L. Moreadith, Vice President, Nuclear Engineering -

J. L. LaPoint, Site. Director Sequoyah Nuclear Plant R. L. Gridley, Director Nuclear. Safety,and Licensing

-M. Burzynski,_ Acting Site e Licensing. Manager _

TVA-Representative, Rockville Office

General Counsel, TVA State of_. Tennessee'.

bec: D, M. Crutchfield,.NRR-B D. Liaw, NRR

- S' C. Black, NRR?

R. C. Pierson, NRR-L. _J. Watson, NRR/RII J. B. Brady, NRR/RII-J'.' Rutberg, OGC NRC Resident Inspector NRC. Document Contro1' Desk.

NRR/ I NRR/RII JJ[r d

l I

y L a son 2/}/89 2/ /89 a

_.m______-_____.m.

____._._.__.__a

_n_.__

_