ML20247D366
| ML20247D366 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/03/1989 |
| From: | Julian C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20247D369 | List: |
| References | |
| NUDOCS 8903310056 | |
| Download: ML20247D366 (2) | |
See also: IR 05000425/1989008
Text
pr.m,- :gy
.
. m.
z=-
,
3
. .
, ~ 9' .
,.
, , ,
W
"
<
un cama
y
1.
,
.
(
.. F
f
1'
Docket No.'50-425
Licen:;e No. NPF-79
. .
' Georgia Power _ Company:
ATTN:
Mr.:W. G. tiairston, III
Senior Vice President -
Nuclear' Operatiuns
-P. O. Box 1295
Birmingham, AL 35201
' Gentlemen:
n
SUBJECT:
NRC' INSPECTION REPORT N0. 50-425/89-08
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted-by
A. Szczepaniec on January 23-27, 1989.
The inspection : included .a' . review of
activities authorized .for;your Vogtle- 2 facility.
At the' conclusion of the
inspection, the findings were discussed with 'those members 'of your staff
identified. in the enclosed Inspection Report,
w
' Areas examined during' the inspection are identified in the ' report.
Within-
.these areas, the inspection consisted of selective examinations of. procedures
and representative records, interviews with personnel,' and observation of'-
activities in progress.
' Within the scope of the inspection, no- violations or deviations were
identified.
In accordance with Section 2.790 of the NRC's " Rules of. Practice," Part 2,
Title'10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Documsnt Room.
Should you have any questions concerning this letter, please contact us.
Si ncerely,
S
Caudle A. Julian, Chief
Engineering Branch
Division of Reactor Safety
Enclosure:
NRC Inspection Report
cc w/ encl:
(See page 2)
8903310056 890303 '
'
$DR
ADOCM 05000425
'\\
PNU;
.
_
-
_ _
.--
-
-
..
,
o
gf
y
3
'
'
'
,
, . .
,
E
'; Georgia ~ Power Company
2
..
,
.
- ,
'cc w/ enc 1:
.R.'P. Mcdonald', Ex.ecutive Vice
'
President,~ Nuclear Operations.-
"P. D.-Rice, Vice; President, Project
' Director
C. W.7 Hayes -Vogtle-Quality
Assurance.Nanager'
G. Bockhold,-Jr. , General Manager.
.. Nuclear Operations'.
J. P,-Kane', Manager Licensing
.and Engineering.
LJ. A.. Bailey, Project Licensing-
-
. Manager
B. W.: Churchill,.Esq.,.Shaw,
Pittman,'Potts and Trowbridge
D. Kirkland, III -Counsel,.
'
Office of the Consumer's Utility-
'"
Council'..
..
.
D. Feig, Georgians Against-
Nuclear Energy
State of Georgia
bcc V encl:
E. ',e' s ,' 0GC '
i
J.;topkins, NRRL
M.
.inkule, RII
..
DRS Technical Assistant
NRC. Resident Inspector
Document' Control Desk
RII
RII
Ril
RII
-
JZeilerier
ASzczepaniec
A elisle
MS k le
02////89
02/1[/89
02/ /89
02/ /89
,
w-.-..-._--..