VIRGINIA ELECTRIC AND POWER COMPANY.
RICHMOND, VIRGINIA 23261 i
May 18, 1989 U.S.' Nuclear Regulatory Commission Serial No.89-359 Document Control Desk PES /ISI/FPB Washington, D.C. 20555 -
Docket No.
50-339 License No.
NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER CQMPANY r
NORTH ANNA POWER STATION UNIT 2 STEAM GENERATOR TUBE PLUGGING REPORT North Anna Unit 2 completed eddy current examination of all three steam generators during the recent 1989 refueling outage. As required by Technical Specification 4.4.5.5.a, attached is a listing of those tubes that were plugged during the recent outage.
Very truly yours, W. L. Stewart Senior Vice President - Power Attachment cc:
U. S. Nuclear Regulatory Commission 101 Marietta Street, N.W.
Suite 2900 Atlanta, GA 30323 Mr. J. L. Caldwell NRC Senior Resident inspector North Anna Power Station e9o525o3op spo33g DR ADOCK 05000339 PDC k
p (t g l
L
'e e e
e ATTACHMENT VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA UNIT 2 STEAM GENERATOR TUBE PLUGGING REPORT REFUELING OUTAGE - SPRING 1989
)
i Steam Generator-Examination Virginia Electric and Power Company North Anna Power Station Unit 2 Steam Generators A, B, & C Tubes Plugged Summary -
The following tables list the tubes plugged in the North Anna Unit 2 Steam Generators during the 1989 refueling outage.
Table No.1:
- Total number of tubes plugged in Steam Generator A.
Table No. 2:
Total number of tubes plugged in Steam Generator B.
Table No. 3:
Total number of tubes plugged in Steam Generator C.
1 l
l 1
l l
l Table No.1 I
Total number of tubes plugged during the 1989 refueling outage in Steam Generator A The following tubes were plugged based on eddy current indications:
Egg Column 12 46 15 37 24 45 33 39 l
l i
e a
K :..
(;
' Table No. 2 Total number of tubes plugged during the 1989 refueling l
outage in Steam Generator B 1
The following tubes were plugged based on eddy current indications:
Egg Column 02 51 02.
53-02 57 02 59 13 48 l
15 51 17 12 27 16 39 45 39 49
..:,/
Table No. 3 i
. Total number of tubes plugged during the 1989 refueling outage in Steam Generator C The following tubes were plugged based on eddy current indications:
Bow
. Column I
02 45.
02 61 05 38 08 25 17 44 21 24 24 13 26 24 29 32 29 48 32 29 33 35 35 43 37 58 40 42 41