Forwards Listing of Tubes Plugged During Eddy Current Exam of Steam Generator During 1989 Refueling Outage
ML20247D292
Person / Time
Site: North Anna 
Issue date: 05/18/1989
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
89-359, NUDOCS 8905250309
Download: ML20247D292 (6)


Text

_ - _ - _ _ _ _

H m

VIRGINIA ELECTRIC AND POWER COMPANY.

RICHMOND, VIRGINIA 23261 i

May 18, 1989 U.S.' Nuclear Regulatory Commission Serial No.89-359 Document Control Desk PES /ISI/FPB Washington, D.C. 20555 -

Docket No.

50-339 License No.

NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER CQMPANY r

NORTH ANNA POWER STATION UNIT 2 STEAM GENERATOR TUBE PLUGGING REPORT North Anna Unit 2 completed eddy current examination of all three steam generators during the recent 1989 refueling outage. As required by Technical Specification 4.4.5.5.a, attached is a listing of those tubes that were plugged during the recent outage.

Very truly yours, W. L. Stewart Senior Vice President - Power Attachment cc:

U. S. Nuclear Regulatory Commission 101 Marietta Street, N.W.

Suite 2900 Atlanta, GA 30323 Mr. J. L. Caldwell NRC Senior Resident inspector North Anna Power Station e9o525o3op spo33g DR ADOCK 05000339 PDC k

p (t g l

L

'e e e

e ATTACHMENT VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA UNIT 2 STEAM GENERATOR TUBE PLUGGING REPORT REFUELING OUTAGE - SPRING 1989

)

i Steam Generator-Examination Virginia Electric and Power Company North Anna Power Station Unit 2 Steam Generators A, B, & C Tubes Plugged Summary -

The following tables list the tubes plugged in the North Anna Unit 2 Steam Generators during the 1989 refueling outage.

Table No.1:

- Total number of tubes plugged in Steam Generator A.

Table No. 2:

Total number of tubes plugged in Steam Generator B.

Table No. 3:

Total number of tubes plugged in Steam Generator C.

1 l

l 1

l l

l Table No.1 I

Total number of tubes plugged during the 1989 refueling outage in Steam Generator A The following tubes were plugged based on eddy current indications:

Egg Column 12 46 15 37 24 45 33 39 l

l i

e a

K :..

(;

' Table No. 2 Total number of tubes plugged during the 1989 refueling l

outage in Steam Generator B 1

The following tubes were plugged based on eddy current indications:

Egg Column 02 51 02.

53-02 57 02 59 13 48 l

15 51 17 12 27 16 39 45 39 49

..:,/

Table No. 3 i

. Total number of tubes plugged during the 1989 refueling outage in Steam Generator C The following tubes were plugged based on eddy current indications:

Bow

. Column I

02 45.

02 61 05 38 08 25 17 44 21 24 24 13 26 24 29 32 29 48 32 29 33 35 35 43 37 58 40 42 41