ML20247D279

From kanterella
Jump to navigation Jump to search
Advises That Replacement of Unit 1 Emergency Diesel Generator Wattmeters W/Class 1E Certified Wattmeters Prior to Hot Functional Testing,Completed on 890619,after Completion of Hot Functional Testing,Per 880325 Commitment
ML20247D279
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/21/1989
From: William Cahill, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-89509, NUDOCS 8907250139
Download: ML20247D279 (1)


Text

.-_-_..

a e

y ',

e y

c 1""" E

' Log.' # TXX-89509

~

.~

File '# 10068

.=

r s

filELECTRIC.

WMilam J. Cabia, Jr.

. Executive Vice President H

U. S. Nuclear Regulatory Commission Attn: Document Control Desk'

. Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 REVIEW OF TECHNICAL CONCERNS AND ALLEGATIONS REVISED COMPLETION DATE FOR CONCERN 1.B.4.a REF:

TU Electric' letter TXX-88294 from J. W. Beck

..to the NRC dated Narch 25,.1988.

Gentlemen:

In.the referenced response to NRC Staff Concern 1.B.4.b, TU Electric' committed to replace the Unit-1 Emergency Diesel Generator wattmeters with Class 1E certified wattmeters prior to Hot Functional' Testing. This replacement was completed on June 19, 1989, after completion of Hot Functional.Testinq. There-is.no safety. significance to the delay since the certified wattmeters were not-required for the Hot Functional Testing.

Sincerely.

William J. Cahill, Jr.

By:

D. R. Woodlan Docket Licensing Manager RSB/vid ll r.

c --Mr.

R. D. Martin, Region IV Resident Inspectors. CPSES (3)

I' pD O

8907250139 890721

?)

PDR-ADOCK 05000445 R

A PDC py 400 North Olive Street LB81 Dallas, Texas 75201

'L____---

- _ _ _ -