MAR 2 01989
Docket Nos. 50-352
50-353
Philadelphia Electric Company
ATTN:
Mr. C. A. McNeill
Executive Vice President
Nuclear
Correspondence Control Desk
P.O. Box 7520
Philadelphia, PA 19101
Gentlemen:
Subject: Combined Inspection Report Nos. 50-352/89-06 and 50-353/89-06
This refers to the special team inspection, conducted by Mr. A. G. Krasopoulos
of this office on January 23-27, 1989, at the Limerick Generating Station,
Units 1, and 2, Limerick, Pennsylvania, of the safe shutdown capability of the
plants in the event of a fire and other activities authorized by NRC License
Nos. NPF-39 and CPPR 107 and to the discussions of our findings held by
Mr. A. G. Krasopoulo, with Mr. McCormick of your staff at the conclusion of
the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
This
violation has been categorized by severity level in accordance with the
" General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C.
You are required to respond to this letter within 30
days and in preparing your response, you should follow the instruction in
Appendix A.
Your attention is also directed to several items that require timely
resolution.
Specifically, you should address the high impedance fault concern
described in Section 7.2 of the report and the high/ low pressure interface
,
concern described in Section 7.3.
The responses directed by this letter and the accompanying Notice are not
I
'
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
OFFICIAL RECORD COPY
CIR LIM 89-06 - 0001.0.0
3
03/16/89
8903300305 890320
T E.Ol
I \\
ADOCK 05000352
Q
- _ _ _ _ - - _ _ _ - -
- - - - - -
---
-___
_ _ _ - _ _ _ - _ _
_
_ _ -
MAR 2 01989
.-
-
..
, ,
.
.
Philadelphia Electric Company
2
]
Your cooperation with us in this matter is required.
Sincerely,
!
0: icirra. 5isnsa By:
Jacqua F.Durr
Jacque P. Durr, Chief
Engineering Branch
Division of Reactor Safety
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Combined Inspection Report Numbers 50-352/89-06 and
50-353/89-06
)
cc w/ enc 1:
John S. Kemper, Sr., Senior Vice President - Nuclear
,
E. C. Kistner, Chairman, Nuclear Review Board
{
Graham M. Leitch, Vice President, Limerick Generating Station
J. W. Gallagher, Vice President - Nuclear
j
Troy B. Conner, Jr. , Esquire
Eugene J. Bradley, Esquire, Assistant General Counsel
W. M. Alden, Director, Licensing Section
Public Document Room (PDR)
i
Local Public Document Room (LPDR)
,
l
Nuclear Safety Inforc:ation Center (NSIC)
3
'
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
Section Chief, DRP
j
'
Robert J. Bores, DRSS
l
l
+
I
(/(C
&
'
RI:DRS
M
RI:[RS
RI:DRS
Krasopoulos/rw
Anderson '
Durr
3/? /89
3/7 /89
3//'7 /89
0FFICIAL RECORD COPY
CIR LIM 89-06 - 0002.0.0
03/16/89
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _
- - _ _ .