ML20247C800

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-382/89-08 on 890301-0415 & Notice of Violation.Engineering Evaluation Errors Documented & Corrective Action Expected.Unresolved Item Re Inappropriate Drawing Change Noted
ML20247C800
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/16/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20247C804 List:
References
NUDOCS 8905250052
Download: ML20247C800 (3)


See also: IR 05000382/1989008

Text

.

. . . - -

._ __ _ _ _ - . _ -

~

,

s

.

7 ,

a "'I MAY I 6 519

.In Reply Refer.To:

Docket: 50-382/89-08

,

Louisiana' Power &' Light Company.

J.-G._Dewease, Senior'Vice President

'

-ATTN:

. Nuclear Operations

317 Baronne Street.

New Orleans, Louisiana' 170160

w

Gentlemen:

This refers to the inspection conducted by Messrs W. F. Smith and T.. R. Staker

- of-this office duriug the . period March 1 through April 15, 1989,- of activities

authorized by NRC Operating License NPF-38 for Waterford Steam Electric

Station,, Unit' 3, and to the discussion of our findings with Mr. J. R. McGaha

and other members.of your staff at the conclusion of the inspection.

. Areas' examined during the inspection included plant status, monthly maintenance

. observation, onsite followup of events, engineered safety feature system.

. walkdown, operational safety verification, monthly surveillance observation,

.and licensee event report. followup. Within these areas, the inspection

consisted of. selective examination of procedures and representative records,

interviews with personnel, and observations by the NRC inspectors. The

inspection findings:are documented in the enclosed inspection report.

During' this~ inspection, it was found that certain of your activities were in

vio1'ation of NRC requirements. Consequently, you are required to respond to

this-violation, in writing, in accordance with the. provisions of Section 2.201

of the NRC's," Rules of Practice," Part 2, Title 10, Code of Federal

-Regulations. Your. response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

In paragraph 4, we have documented a number of cases where errors were made

during engineering evaluations but were not caught during the checking and

review process. While it is understood that errors will be made, we expect the

review process to eliminate them to a greater degree than your staff appears to

have been demonstrating in the recent past. We further expect that you will

take action to improve this area of concern.

One unresolved item is identified in paragraph 4.d pertaining to multiple

problems associated with an inappropriate drawing change and its possible

~ impact on the operability of the Component Cooling Water System.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 8 of tne enclosed report.

RIV.: RI

TStaker[p

.'

-WSmith

k NDRP/A

Chamberlain

0:0RP k

LJCallan k

$ //4 /89 f /4 /89 f//4/89 77/6/89

8905250052 890516

PDR ADOCK 05000382

.o PDC

- - - _ . _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ - - _ _ - - _ _ _ _ _ _ _ _ - _ _ _ _ - _ - _ - _ _ - _ _ _ - - _ _ - _ _ _ _ _ -

F-~

.

.

.-

.

Louisiana Power & Light Company -2-

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

. Original S&ned By:

U,3: CALLAN

L. J. Callan, Director

Division of Reactor Projects

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-382/89-08

cc w/ enclosures:

Louisiana Power & Light Company

ATTN: R. P. Barkhurst, Vice President

Nuclear Operations '

P.O. Box B

Killona, Louisiana 70066

Louisiana Power & Light Company

ATTN: N. S. Carns, Plant Manager

P.O. Box B

Killona, Louisiana 70066

Louisiana Power & Light Company

ATTN: R. F. Burski, Manager

Nuclear Safety & Regulatory Affairs

317 Baronne Street

P.O. Box 60340

New Orleans, Louisiana 70160

Louisiana Power & Light Company

ATTN: L. W. Laughlin, Site

Licensing Support Supervisor

P.O. Box B

Killona, Louisiana 70066

Louisiana Power & Light Company

ATTN: G. M. Davis, Manager

Events Analysis Reporting and Response

P.O. Box B

Killona, Louisiana 70066

I

_ _ _ _ _ _ _ _ - _ _ _ _ - -

_ _- . _ _ _ _- _ . _ _ _ _

..

<

! .

l. . ,

,

.I

'

.

' Louisiana Power &' Light Company -3- 1

i

Middle South Services

ATTN: Mr. R. T. Lally

P.O. Box 61000

New Orleans, Louisiana 70161

Louisiana Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV

  • Section Chief (DRP/A) *DRP

RPSB-DRSS * MIS System

  • Project Engineer, DRP/A *RSTS Operator
  • DRS *RIV File

"Lism. Shea, RM/ALF

  • D. Wigginton, NRR Project Manager, MS: 13D-18
  • w/766

.

h