ML20247C646

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-445/89-46 & 50-446/89-46 on 890607- 0705.No Violations or Deviations Noted
ML20247C646
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/19/1989
From: Warnick R
Office of Nuclear Reactor Regulation
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20247C652 List:
References
NUDOCS 8907240404
Download: ML20247C646 (4)


See also: IR 05000445/1989046

Text

_.

_ _ _ _ - .

'

,

s.

a-

.f.

.

,

,

l

JUL I 91989

In Reply. Refer'To:

Dockets: .50-445/89-46

g

50-446/89-46

Mr. W. J.-Cahill, Jr.-

Executive Vice President

TU Electric

400 North Olive Street, Lock Box 81

Dallas, Texas

75201

Dear Mr. Cahill:

This refers to the inspection conducted by Mr. C. Hale and a

consultant during the period June 7 through July 5, 1989, of

activities authorized by NRC Construction Permits CPPR-126 aad

CPPR-127 for the. comanche Peak Steam Electric Station, Unitt. 1

and 2, and to the discussion of our findings with

you and ather

members of.your staff at the conclusion of the inspectio?.

The enclosed: copy of our inspection report identifies areas

examined during the inspection.

Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the

inspectors.

Within the scope of the inspection, no violations or deviations

were' identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

ORIGINAL CIGNED EY R. F. WARNICK

R. F. Warnick, Assistant Director

for Inspection Programs

Comanche Peak Project Division

Office of Nuclear Reactor Regulation

Enclosure:

Inspection Report 50-445/89-46; 50-446/89-46

cc w/ enclosure:

See next page

IP:CPP ANRR

IP:CPPD:NRRj

AD:IP:CPPD:NRR

HLivermored

RWarnick FRd

/p[

'

CHale

1

7/)9/8

7/\\h/89

7/s9/89

i

8907240404 890719

8If

PDR

ADOCK 05000443

I

Q

PDC

- - __ -

. y_

_ _ -

. _ -

_

_,

,

.3

%:

g

UNITED STATES

j

g'

NUCLEAR REGULATORY COMMISSION

y

E

WASHINGTON, D. C. 20555

q

\\. . . . . #

JUL I 91989

In Reply-Refer To:

Dockets:

50-445/89-46

50-446/89-46-

Mr. W. J. Cahill, Jr.

. Executive Vice President

TU' Electric

400 North Olive' Street, Lock Box 81

Dallas, Texas

_75201

x

Dear Mr.-Cahill:

This refers to the inspection conducted by Mr. C. Hale and a

consultant during the period June 7 through July 5, 1989, of

-activities. authorized by NRC Construction Permits CPPR-126 and

CPPR-127 for the comancholPeak' Steam Electric Station, Units 1

and 2, and to.the discussion of our findings with. you and other

members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection.

Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the

inspectors.

Within the scope.of the inspection, no violations or deviations

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of-'this letter and the enclosed inspection' report will be

placed in the NRC Public' Document Room.

Should you.have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

R F ID a u tiekt

R. F. Warnick, Assistant Director

for Inspection Programs

Comanche Peak Project Division

Office of Nuclear Reactor Regulation

Enclosure:

Inspection Report 50-445/89-46; 50-446/89-46

cc w/ enclosure:

See next page

. _ _ - _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ - _ - _ _ -

_

,

,

'.

,

l

<

i_,

1. . . :

J

l

.

W. J. Cahill, Jr..

-cc w/ enclosure:

Roger D. Walker

TU Electric

i

Manager, Nuclear Licensing

c/o Bethesda Licensing

TU Electric

3 Metro Center,. Suite 610

<

Skyway Tower.

Bethesda, Maryland

20814

400. North Olive Street, L.B.

81

Dallas, TX

75201

E. F. Ottney

P. O. Box'1777

Juanita Ellis

Glen Rose, Texas _76043

President'- CASE

1426 South Polk Street

Joseph F. Fulbright

Dallas, TX

75224

Fulbright & Jaworski-

1301 McKinney Street

Susan M. Theisen

Houston, Texas

77010

Assi.stant Attorney General

Environmental Protection Division

George A. Parker,~ Chairman

P.O. Box 12548, capitol Station

Public Utility Committee

Austin, TX

78711-1548

Senior Citizens Alliance of

Tarrant County, Inc.

GDS Associates, Inc.

6048 Wonder Drive

1850 Parkway Place, Suite 720

Fort Worth, Texas

76133

Marietta, GA

30067-8237

Jack R. Newman, Esq.

'

Lanny A. Sinkin

Newman & Holtzinger, P.C.

Christic Institute

Suite 1000

1324 N. Capitol Street

1615 L. Street N.W.

Washington, DC

20002

Washington, D.C.

20036

Ms. Billie Pirner Garde, Esq.

Garde Law Office

104 East Wisconsin Avenue

Appleton, WI

54911

Regional Administrator, Region IV

U.S. Nuclear Regulatory Commission

611 Ryan Plaza Drive, Suite 1000

Arlington, Texas

76011

William A. Burchette, Esq.

Counsel for Tex-La Electric

Cooperative of Texas

Heron, Burchette, Ruckert & Rothwell

1025 Thomas Jefferson St., NW

Washington, DC

20007

y y.; 3 mq p^ , ' ,+

m,

- - -

,

,

- -

L

p;:;;g'-.Q})y'

,

- .,

.=;..

.g.

l'g,gf;;.; >

.

' <;. ,

g

.

>

2?

.,

,

s.

a,

,

t>

'

50-445/M-W,; 50-446/89 '/4

.

. DISTRIBUTION:,

'

,

. Dock. sEIy. li.ssE} 5D3.145./ 44. 6_.)..?.

'

I

pg. -

-

LPDR:

.;,

.

.

CPPD-LA

CPPD Reading.(HQ)

ADSP: Reading.

W

  • Site. Reading Tile
  • R..Warnick
  • J. Wiebe.
  • H. Livermore
  • MIS System, RIV
  • RSTS Operator, RIV

RPB, RIV

RIV Docket File

-

  • L.

Shea', ARM /LFMB

J. Taylor'

C.. Grimes'

.P.

McKee

J. Lyons

J. H. Wilson

M. Malloy

'J. Moore, OGC-WF

M. Fields

J. Gilliland, RIV

D. Crutchfield

-

't

E. Jordan

B. Grimes-

B.-Hayes

  • w/766

_ ___: -- _-- _ _ i_ _ _ _ _ _ _ _ _ _ _