Text
p
_
,
.
,
-
-
- y~ :. .
)
-
.
.
- '
.)
.
J
-
,
I
MAR C 91989
' Docket Nos.:
50-327 and 50-328
License.Nos.:
-
!
Mr. 01.1ver D. Kingsley, Jr.
-Senior.Vice President, Nuclear Power
-
Tennesee Valley Authority
'
6N 38A Lookout Place
1101. Market Square
-Chattanooga,-TN 37402-2801
Dear Mr. Kingsley:
SUBJECT: NRC INSPECTION REPORT NOS. 50-327/89-02 AND 50-328/89-02
This refers to the special ~ Nuclear Reguletory Commission (NRC) inspection
E
conducted by Kenneth Jenison from January 5
Feboary 4,
1989.
The
inspection included 'a
review of the Unit 2 outage activities.
At the-
conclusion of the-inspection, the findings were discussed -with .those . members
-
.
of'your staff. identified in the enclosed inspection. report.
Areas, examined during the inspection are identified in the. report. These areas
-included control room observation and operational safety verification. Within
these areas, the inspection consisted of selective examinations of procedures
and ' representative records, interviows with personnel, and observation' of
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
Unresolved items were identified concerning Lh ting Condition for Operation
(LCO) entry and exit, Upper Head Injection venti. g procedures, and the seismic
qualification of certain meters. These matters are currently under review by
the Sequoyah Plant Operations Review Staff and will be pursued by the NRC staff
during future inspections.
During the exit conducted for this inspection you committed to implement a
process, by June 1,1989, to notify the QA organization of plant events in
progress to allow prompt QA oversight of the investigation and corrective
action determination processes as necessary.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter, its enclosures,
and any reply will be placed in the NRC's Public Document Room.
.
kO$M osoooggy, ,
890309
G
,\\
PNua
'
1
i
'
g ol
L_
- - - - - - - _ _ - _ _ _ _ _
_ _ _ - - -
J
.,
.
_
_
- - _-
. - _ _
- _ _ _
- _ _ - _ - _ _ - _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ - _ _ - _
..
.t '
'
w f.
J-
.
,
a
- e
, . MAR 0 9 1999 -
Mr. Oliver D. Kingsley, Jr.
-2
.
Should you h' ave any questions ~concerning this letter, please contact us.
Sincerely,
kpd
b(MU
M
Frank R. McCoy, Assistant' Director.
';-
. for' Inspection Programs-
TVA Projects Division:
.
Office of Nuclear Reactor Regulation.-
Enclosure:
.NRC Inspection Report
<
cc w/ enc 1:
F.
L~. Moreadith, Vice President,
.
~ Nuclear Engineering
'
J. L.-LaPoint, Site Director
.Sequoyah' Nuclear Plant
R. L. Gridley, ~ Director
Nuclear Safety and. Licensing.
' M. Burzynski, Acting Site Licensing
. Manager
.
TVA Representative, Rockville' Office
Genera 1' Counsel, TVA-
State of Tennessee
.bcc w/ enc 1:
D. M. Crutchfield, NRR
B. D. Liaw, NRR
S. C. Black, NRR
R. C. Pierson, NRR
L. J. Watson, NRR/RII
J. B. Brady, NRR/RII
J. Rutberg, OGC :
NRC Resident Inspector
,.
NRC Document Control Desk
i
l
'
NRR/R I
NRR/RII
J
'J
dy:tm
L
on
03/9 /89
03/}/89
I
. _ - - -
_ _ - _ _ _ - _
_ - - _ _ _ _ _ _ _ - _ _
_
a