ML20247C585

From kanterella
Jump to navigation Jump to search
Forwards end-of-Cycle 2 Refueling Outage Steam Generator Insp Rept.Eight Tubes Removed from Svc by Plugging W/Rolled Mechanical Plugs
ML20247C585
Person / Time
Site: Catawba 
Issue date: 05/15/1989
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8905240517
Download: ML20247C585 (2)


Text

. -. _ _ _. _ _ _

7 9; < ymb Duny. PowEn Goniwsy.

P.O. DOX 33189 i

CHARLOTTE, N.O. 28242

'HALB.TUCKEH (7o7Er"Enm May 15,11989 Document-Control Desk

~

U. S. Nuclear. Regulatory Commission Washington, D.-C.

20555

-Subjects N tawba Nuclear ~ Station, Unit 2 Docket No. 50-414-End of Cycle 2 Steam Generator Inspection.

Gentlemen:

Pursuant to Catawba Nuclear. Station Technical Specifications 4.4.5.5.a and 6.9.2, please-find attached the Catawba Unit 2 end of cycle 2 refueling outage steam generator inspection report.-This inservice inspection of steam generators A,.B, C, and D was performed in April 1989. As a result of this inspection, eight tubes were removed from service by plugging with rolled mechanical' plugs.

Very truly yours',

H. B.' Tucker j"T/3/SGU2E0C2-Attachments xc: Mr. S. D. Ebneter

-Acting Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta St., NW, Suite 2900 Atlanta, Georgia 30323 h

.Mr..W. T. Orders NRC Resident Inspector Catawba Nuclear Station

.ek 8905240517 890515 g

\\\\

PDR ADOCK 05000414 Q

PDC

1

,.=

j 1

CATAWBA NUCLEAR STATION UNIT 2 END OF CYCLE 2 REFUELING OUTAGE STEAM GENERATOR INSPECTION REPORT a

STEAM TUBES GENERATOR PLUGGED A

2 B

5 C

1 0

0 o

__________.____w