ML20247B980
| ML20247B980 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/02/1989 |
| From: | Julian C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20247B982 | List: |
| References | |
| NUDOCS 8903300092 | |
| Download: ML20247B980 (2) | |
See also: IR 05000424/1989003
Text
rg
--
-
e
j
,
m
4
47~u
g
4~:
(Ph
'
L
MARLO21989L
1
'
.
i
.
1
'
p .1._
Docket Nos.' 50-424, 50-425
~ License Nos' NPF-68,-CPPR-109
q
.
,
.
1/
1
Georgia Power Company _
ATTN: Mr.
W.- G. Hairston, III
I
4
Senior Vice President -
Nuclear Operations
P. 0. Box 1295-
Birmingham, AL 35201
'
!
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
-(NRCINSPECTICNREPORT-NOS. 50-424/89-03 AND 50-425/89-03)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
J. L.: Coley on January 9 - 13, 1989.
The inspection included a review of
activities authorized for. your Vogtle facility.
At the conclusion of the
inspection, the findings; were discussed with those members of yourl staff
identified in the' enclosed Inspection Report.
Areas examined during .the inspection are identified in the report.
Within
these, areas,' the inspection consisted of selective examinations of procedures
y
and representative records, interviews with personnel, .and observation of
activities-in progress.
The inspection findings indicate that certain activities appeared to violate
NRC . requirements.
The violation, references to pertinent requirements, 'and
elements to be included in your response are described in the enclosed Notice
of Violation.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title.10, Code of Federal Regulations, a copy of this letter and its enclosures
will'be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
ORIGINAL $lGNED BY
e
h903300092"NoN24
h
CAUDLE A.JULIAN
i
o
Ap0CK O
pHU
Caudie A. Julian, Chief
DR
o
Engineering Branch
Division of Reactor Safety
Enclosures:
(See Page 2)
\\\\
12 I
-
.
._.
_
_.
-
- _ _ _ . -
.
. _ - _ _ _ -
.
..
.
- M 02 $89
Georgig Power Company
2
<
Enclosures:
-1.
2.
NRC Inspection Report
cc w/encis:
R. P. Mcdonald, Executive Vice
President, Nuclear Operations
P. D. Rice, Vice President, Project
Director
C. W. Hayes, ilogtle Quality
Assurance Manager
G. Bockhold, Jr., General Manager,
Nuclear Operations
J. P. Kane, Manager Licensing
and Engineering
J. A. Bailey, Project Licensing
Manager
B. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
D. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
D. Feig, Georgians Against
Nuclear Energy
State of Georgia
bec w/encis:
E. Reis, 0GC
J. Hopkins, NRR
M. Sinkule, RII
DRS Technical Assistant
NRC Resident Inspector
Document Control Desk
i
t
A
P
/
f
hlR
RII
I
RIIg;
JLColey:mlh
MGlh., man
J
ake
MSinkule
02/c6/89
02/ o/89
t//gy'89 02/ip/89
_ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ .