ML20247B905
| ML20247B905 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 05/05/1998 |
| From: | Powers D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hagan J ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20247B907 | List: |
| References | |
| 50-416-98-04, 50-416-98-4, NUDOCS 9805110144 | |
| Download: ML20247B905 (5) | |
See also: IR 05000416/1998004
Text
__
.
g* "'%g
UNITED STATES
- 1
A*4
NUCLEAR REGULATORY COMMISSION
'
!
e
{
$
REGION IV
!
k+9 * * . . * /
af
611 RYAN PLAZA ORIVE. SulTE 400
AHLINGTON, TEXAS 760114064
May 5, 1998
Joseph J. Hagan, Vice President
Operations - Grand Gulf Nuclear Station
Entergy Operations, Inc.
l
P.O. Box 756
i
Port Gibson, Mississippi 39150
SUBJECT: NRC INSPECTION REPORT 50-416/98-04
Dear Mr. Hagan:
From April 14-16,1998, an inspection of your inservice inspection activities was performed at
your Grand Gulf Nuclear Station reactor facility. The results of this inspection were discussed
with Mr. W. Eaton and other members of your staff at the conclusion of the inspection. The
enclosed report presents the scope and results of that inspection.
The inspector determined, by observation of the limited inservice inspection and ASME Code
replacement activities ongoing during the inspection, and by review of records, that the inservice
inspection program was being adequately implemented in accordance with licensee procedures,
ASME Code requirements, and NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions conceming this inspection, we will be pleased to discuss them
with you.
Sincerely,
Y tL h h
md
Dr. Dale A. Powers, Chief
-
Maintenance Branch
!
Division of Reactor Safety
l
1
Docket No.:
50-416
,
License No.: NPF-29
Enclosure:
NRC Inspection Report
50-416/98-04
\\
l
9805110144 990505
'PDR
ADOCK 05000416
G-
- - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ - _ - _
_ _ _ _ _ _ _ _ _
_
_ - -
. _ _ _ _ .
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _
_-
i
Entergy Operations, Inc.
-2-
cc wfenclosure:
Executive Vice President
and Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississipp 39286-1995
.
.
!
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
Winston & Strawn-
1400 L Street, N.W. - 12th Floor
l
Washington, D.C. 20005-3502
l
Sam Mabry, Director
'
Division of Solid Waste Management
Mississippi Department of Natural
Resources
P.O. Box 10385
Jackson, Mississippi 39209
President
Claiborne County Poard of Supervisors
Port Gibson, Missie ippi 39150
General Manager
'
Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
The Honorable Richard leyoub
Attorney General
Department of Justice
State of Louisiana
P.O. Box 94005
Baton Rouge, Louisiana 70804-9005
Office of the Govemor
State of Mississippi
Jackson, Mississippi 39201
- _ _ _ _ _ - _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ - _ -
. . . .
- - _ _ - _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _
_
__ _ _ _ _ _ _
.
.
'
Entergy Operations, Inc.
-3-
- Mike Moore, Attorney General
Frank Spencer, Asst. Attorney General
State of Mississippi-
P.O. Box 22947
Jackson, Mississippi 39225
Dr. F. E. Thompson, Jr.
State Health Officer
State Board of Health
P.O. Box 1700
Jackson, Mississippi 39205
Robert W. Goff, Director
l
State Liaison Officer
Division of Radiation Health
'
Mississippi Department of Health
l-
P.O. Box 1700
l
Jackson, Miss!ssippi 39215-1700
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
l
Director, Nuclear Safety
!
and Regulatory Affairs
l-
Entergy Operations, Inc.
P.O. Box 756
-
l
Port Gibson, Mississippi 39150
!
Vice President, Operations
Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 756
u
Port Gibson, Mississippi 39150
l
1
l
l
I'
l
i
_ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
__J
1
.
,
.
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
' E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
,
bec to DCD (IE01)
I
I
bec distrib. by RIV:
l
Regional Administrator
Senior Resident inspector (River Bend)
DRS Director
DRS Deputy Director
DRP Director
DRS-PSB
Branch Chief (DRP/F)
MIS System
Project Engineer (DRP/F)
RIV File
Branch Ch3f (DRP/TSS)
Resident inspector
,
.i
s
i
l
1
DOCUMENT NAME: r:\\_gg\\GG804rp.wpa
To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
SRl:MB:RIV
C:MB
E
C:PBF
C:MB
E
l
WPAng/imb
DAPowersVO/>
DFKirsch*
DAPowersJ#
04/28/98
(K/5798
04/29/98
05/5/98
!
'
'
- concurred per telecon
OFFICIAL RECORD COPY
l
______. -
- _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ - - - - _ _
l:
s
L
g.
Entergy Operations, Inc.
-4
- E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
- E-Mail report to Document Control Desk (DOCDESK) -
E-Mail report to Richard Correia (RPC) -
E-Mail report to Frank Talbot (FXT) .-
bec to DCD (IE01)
bec dis' rib. by RIV:
t
i
Regional Administrator
Senior Resident inspector (River Bend)
DRS Director -
DRS Deputy Director
DRP Director
DRS-PSB
.
Branch Chief (DRP/F)
MIS System
"
Project Engineer (DRP/F)
RIV File
Branch Chief (DRP/TSS)
Resident inspector
i
l
l
I
i
3 00 @
l
DOCUMENT NAME: r:\\_gg\\GG804rp.wpa
- To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
SRI:MB:RIV
C:MB
E
C:PBF
C:MB
E
WPAng/Imb
DAPowerso t'
DFKirsch*
DAPowers4/
04/28/98
TIF/98
04/29/98
05/5/98
'
- concurred per telecon
OFFICIAL RECORD COPY
l-
,
m_ _ _ _ _ _ _ _ _ _ _
_______.m_
_ _ _ _ . _ _ _ _ _ . , , _ _ _ _ _ _
___m._.
.-
-