ML20247A756
| ML20247A756 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 03/15/1989 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
| Shared Package | |
| ML20247A761 | List: |
| References | |
| NUDOCS 8903290183 | |
| Download: ML20247A756 (2) | |
See also: IR 05000482/1989007
Text
_ _ - _ _ - _ _ _ _
L
.
.
-
g..
'In Reply Refer To:
Docket: .STN 50-482/89-07
,
f-
Wolf _ Creek Nuclear Operating. Corporation
,
ATTN:
Bart D. Withers
"
President and Chief Executive Officer
P.O. Box 411
Burlington, Kansas 66839
Gentlement
This refers to the inspection conducted by Mr. D. R. Hunter of this office
' during the period February 13-17, 1989, of activities authorized by NRC
.
Operating License NPF-42 for the Wolf Creek Generating Station, and to the
discussion of our findings with Mr. G. D. Boyer and other members of your staff
at.the conclusion of the inspection.
Areas-examined during the inspection included facility modifications and
offsite technical support staff. Within these areas, the inspection consisted
r
of selective examination of procedures and representative records, interviews
with personnel, and observations by the NRC inspector. The inspection findings
are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
these. violations, in writing, in accordance with the provisions of ~
Section.2.201 of the NRC's " Rules of Practico," Part 2, Title 10 Code of
Federal Regulations. "Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject-
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased t'o
discuss them with you.
Sincerely,
'
>m
i
,
.
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
(see next page)
RIV:0PS*
AC:0PS*
D:DRS*
0: RP
DHunter:lm
WSeidle
JLMilhoan
1.J
M
/ /89
/ /89
/ /89
3 /15 /89
- previously concurred
f
8903290183 890315
l
l
m
{DR
ADOCK 05000482
N
PBC
_____ __ _ _ ____
_ _ _ _ _ - - _ - _ _ - - _ - _
,
,
r.;
'
'
,
Wolf Creek Nuclear' Operating
-2-
'
Corporation-
'1.
Appendix' A -LNotice of Violation
2.--Appendix B
NRC Inspection Report
50-482/89-07 w/ Attachments
cc w/ enclosures:'
Wolf Creek Nuclear Operating Corporation
ATTN: Otto Maynard, Manager
of Licensing
P.O. Box-411.
Burlington, Kansas 66839
' Wolf Creek Nuclear Operating Corporation
ATTN: Gary Boyer, Plant Manager
P.O. Box 411
Burlington, Kansas 66839
Kansas Corporation Comission
ATTN: Robert D. Elliott, Chief Engineer
Fourth Floor. Docking State Office Building
Topeka Kansas 66612-1571
Kansas Radiation Control Program Director
bec to DMB (IE01)
'
bec distrib. by RIV:
- RRI
- -R. D.. Martin,.RA
,
- SectionChief(DRP/D)
. *DRP
'*RPB-DRSS
R. DeFayette, RIII
- RIV File
SRI, Callaway, RIII
- MIS System,
- RSTS Operator.
- Project Engineer, DRP/D
Lisa Shea, RM/ALF
- DRS
- W. C. Seidle
- D.' V. Pickett, NRR Project Manager (MS:
13-D-18)
- D. R. Hunter
J. E. Gagliardo
L-
- w/766
l
..
I
l
'
1
L
p
u
_ - - - - - - - _ - - _ - - - _ - - - - - - - - - - - - - - - - - - . - - - - - - - _ - - - - _ - - - - - - - - - - - - - - - - - - _ - - _ - - - - - - - _
- - - - - - - -
- - - - _ - - - - - - - - - - - - - _ _ - . - - _ - - - - _
-.
- - - - - _