Forwards Insp Rept 50-482/89-07 on 890213-17 & Notice of Violation
ML20247A756
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 03/15/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20247A761 List:
References
NUDOCS 8903290183
Download: ML20247A756 (2)


See also: IR 05000482/1989007

Text

_ _ - _ _ - _ _ _ _

L

.

.

-

g..

'In Reply Refer To:

Docket: .STN 50-482/89-07

,

f-

Wolf _ Creek Nuclear Operating. Corporation

,

ATTN:

Bart D. Withers

"

President and Chief Executive Officer

P.O. Box 411

Burlington, Kansas 66839

Gentlement

This refers to the inspection conducted by Mr. D. R. Hunter of this office

' during the period February 13-17, 1989, of activities authorized by NRC

.

Operating License NPF-42 for the Wolf Creek Generating Station, and to the

discussion of our findings with Mr. G. D. Boyer and other members of your staff

at.the conclusion of the inspection.

Areas-examined during the inspection included facility modifications and

offsite technical support staff. Within these areas, the inspection consisted

r

of selective examination of procedures and representative records, interviews

with personnel, and observations by the NRC inspector. The inspection findings

are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these. violations, in writing, in accordance with the provisions of ~

Section.2.201 of the NRC's " Rules of Practico," Part 2, Title 10 Code of

Federal Regulations. "Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject-

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased t'o

discuss them with you.

Sincerely,

'

>m

i

,

.

L. J. Callan, Director

Division of Reactor Projects

Enclosures:

(see next page)

RIV:0PS*

AC:0PS*

D:DRS*

0: RP

DHunter:lm

WSeidle

JLMilhoan

1.J

M

/ /89

/ /89

/ /89

3 /15 /89

  • previously concurred

f

8903290183 890315

l

l

m

{DR

ADOCK 05000482

N

PBC

_____ __ _ _ ____

_ _ _ _ _ - - _ - _ _ - - _ - _

,

,

r.;

'

'

,

Wolf Creek Nuclear' Operating

-2-

'

Corporation-

'1.

Appendix' A -LNotice of Violation

2.--Appendix B

NRC Inspection Report

50-482/89-07 w/ Attachments

cc w/ enclosures:'

Wolf Creek Nuclear Operating Corporation

ATTN: Otto Maynard, Manager

of Licensing

P.O. Box-411.

Burlington, Kansas 66839

' Wolf Creek Nuclear Operating Corporation

ATTN: Gary Boyer, Plant Manager

P.O. Box 411

Burlington, Kansas 66839

Kansas Corporation Comission

ATTN: Robert D. Elliott, Chief Engineer

Fourth Floor. Docking State Office Building

Topeka Kansas 66612-1571

Kansas Radiation Control Program Director

bec to DMB (IE01)

'

bec distrib. by RIV:

  • RRI
  • -R. D.. Martin,.RA

,

  • SectionChief(DRP/D)

. *DRP

'*RPB-DRSS

R. DeFayette, RIII

  • RIV File

SRI, Callaway, RIII

  • MIS System,
  • RSTS Operator.
  • Project Engineer, DRP/D

Lisa Shea, RM/ALF

  • DRS
  • W. C. Seidle
  • D.' V. Pickett, NRR Project Manager (MS:

13-D-18)

  • D. R. Hunter

J. E. Gagliardo

L-

  • w/766

l

..

I

l

'

1

L

p

u

_ - - - - - - - _ - - _ - - - _ - - - - - - - - - - - - - - - - - - . - - - - - - - _ - - - - _ - - - - - - - - - - - - - - - - - - _ - - _ - - - - - - - _

- - - - - - - -

- - - - _ - - - - - - - - - - - - - _ _ - . - - _ - - - - _

-.

- - - - - _