Notifies of Late Commitment for Implementing Limited QA for Work Affecting SPDS Hardware,Software & Inputs by 890915
ML20247A714
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/06/1989
From: Michael Ray
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8909120196
Download: ML20247A714 (3)


Text

,_,___

f.

~

. TENNESSEE. VALLEY AUTHORITY-CHATTANOOGA. TENNESSEE 37401 SN 157B Lookout' Place s

]

SEP 061989 U.S.~ Nuclear Regulatory Commission ATTN: Document Control Desk j

Washington, D.C.

20555

{

Gentlemen:

'In the Matter of

)

Docket Nos. 50-327'

, Tennessee Valley Authortty

)

50-328

'SEQUOYAH NUCLEAR PLANT (SQN) - NOTIFICATION REGARDING LATE COMMITMENT FOR IMPLEMENTING' LIMITED QUALITY ASSURANCE (QA) FOR SQN'S SAFETY PARAMETER DISPLAY SYSTEM (SPDS)

Reference:

Letter from TVA to NRC. dated September 29, 1987, "Sequoyah Nuclear Plant (SQN)'- Removal of Safety Parameter Display System (SPDS)

From the Critical Structures, Systems and Components (CSSC) List" of the referenced letter contained two TVA commitments associated with.the development of a limited QA program for SQN's SPDS. Commitment Item 1 required that TVA's Nuclear Quality Assurance-Manual.be revised to identify the scope'of a limited QA program for SPDS. This commitment was completed on December 27, 1988. Commitment Item 2 required development of plant procedures to implement.the limited QA program for SQN's SPDS. This commitment was -due for completion by January 1,1989. The purpose of this

. letter is to. inform you of the late status regarding this commitment and TVA's revised. commitment completion date.

Preventative maintenance packages for implementing the limited QA requirements are being developed and are scheduled to be completed by September 15, 1989. Enclosed is TVA's revised commitment with the new completion date. Since the SPDS provides an aid to the operator and does not directly affect plant operation, the limited QA control for SQN's SPDS is not considered to be a safety concern.

Please direct questions concerning this issue to D. V. Goodin at (61S) 843-7734.

Very truly yours, TENNESSEE VALLEY AUTHORITY l v1h Manager, Nuclear l'icensing and Regulatory Affairs Enclosure cc: See page 2 d

e9o912o196 890906.,

ADOCK0500g/

s PDR P

An Equal opportunity Employer

_ = _ _ _ _ _ _ _ - - _ - _ _ _ _ _. -

3:7,,~-

=

f

.p D:V'

_J'

-j p;

l0;y 7

., I V

~l$O~

~

,[y[

,3

= ;- ;

_g_

'SEP 061989

.U.S. Nuclear' Regulatory Commission;

~.

,.;-. p.

y >6 :

j k

.cc (Enclosure):

Ms

'S. C. Black, Assistant Director lK for Projects

'TVA~ Projects Division 6'

(U.S. Nuclear Regulatory Commission One White Flint, North i

'11555 Rockville: Pike 1

Rockville, Maryland 20852-4 y

ph Mr. B.'A. Wilson, Assistant Director

? ".1 for. Inspection Programs-L.

'TVA Projects Division l

U.S. Nuclear' Regulatory Commission j

Region II

')

101 Marietta. Street, NW,-Sulte 2900

{

Atlanta, Georgia. 30323 t

NRC' Resident Inspector-Sequoyah Nuclear Plant 2600 Igou ' Ferry Road:

-l Soddy Daisy, Tennessee 37379 1

.j

-i i

(

i a=____=__-_-__________________________-

1

[

a.

L p:-

Enclosure Revised Commitment Revise and/or develop plant procedures to incorporate and impfement the.

-limited QA program for work affecting SPDS hardware, software, and inputs by September 15, 1989.