ML20247A564
| ML20247A564 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/17/1989 |
| From: | Jaffe D Office of Nuclear Reactor Regulation |
| To: | Mroczka E CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20247A570 | List: |
| References | |
| TAC-65854, NUDOCS 8907210262 | |
| Download: ML20247A564 (2) | |
Text
_
t d
July 17, 1989 Docket No. 50-423 Mr. Edward J. Mroczka Senior Vice President
-Nuclear Engineering and Operations i
Connecticut Yankee Atomic Power Company i
Northeast Nuclear Energy Company P. O. Box 270 I
Hartford, Connecticut 06141-0270
Dear Mr. Mroczka:
SUBJECT:
SAFETY EVALUATION FOR COMPLIANCE WITH THE ATWS RULE - 10 CFR 50.62 (TAC N0. 65854) l The NRC staff has completed its review of your submittals concerning comp (liance with the ATWS Rule for Millstone Unit 3.
The enclosed Safety Evaluation SE) concludes that the AMSAC design proposed by Northeast Nuclear Energy Company for the Millstone Nuclear Power. Station, Unit 3, is acceptable and is in compliancewiththeATWSRule,10CFR50.62, paragraph (c)(1).
The issue of Technical Specifications for ATWS requirements remains an open I
issue as indicated in Item 14 of Section 3.0 of the enclosed SE. Until staff 4
review is completed regarding the use of technical specifications for ATWS
)
requirements, the licensee should continue with the scheduled installation and i
implementation (planned operation) of the ATWS design utilizing administrative 1y contrclied procedures.
This completes all staff at.tivities related to TAC No. 65854.
i
- Sgerely, David H. Jaffe, Project Manager Project Directorate I-4 j
Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
Enclosure:
As' stated cc w/ enclosure:
See next page
[SETAC65854]
DISTRIBUTION
[EcketJWe7 BGrimes NRC & Local PDRs ACRS (10)
Plant File S. Varga
~
B. Boger S. Norris D. Jaffe OGC E. Jordan PDI/II Reading i
LA:P UI-4 PM:
PD:
-4 SNWris DJa JS 07// 7/89 07/7)/89 07/j 9'
(
0s I
l\\\\
j!$$72$'d$Nh3
\\
P
_ __ _ _ _ _ _ _ A
7-
'r s% ?.e%
UNITED STATES p, -
7g g
NUCLEAR REGULATORY COMMISSION E
E WASHINGT ON, D. C. 20555
/
July 17, 1989'
~ Docket No. 50-423
- Mr. Edward J. Mroczka Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Mroczka:
SUBJECT:
SAFETY EVALUATION FOR COMPLIANCE WITH THE
-ATWSRULE-10CFR50.62.(TACNO.65854)
The NRC staff has completed its review of your submittals concerning comp (liance
-with the ATWS Rule for Millstone Unit 3.
The enclosed Safety Evaluation SE) concludes that the AMSAC design proposed by Northeast Nuclear Energy Company for the Millstone Nuclear Power Station, Unit 3, is acceptable and is^in compliance with the'.ATWS Rule,10 CFR 50.62, pareyaph (c)(1).
The issue of: Technical Specifications for ATWS requirements remains an open issue as. indicated in Item 14 of Section 3.0 of the enclosed SE..Until staff review is completed regarding the use of technical specifications for ATWS requirements, the licensee should continue with the scheduled installation and implementation (planned operation) of the ATWS design utilizing administrative 1y controlled procedures.
This completes all staff activities related to TAC No. 65854.
Sincerely, David H. Jaffe, Froject Manager Project Directorate I-4 1
Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page 1
1