. ., 7 . r- .

CCN 89-14072-

-.: T. ,,

1-PHILADELPHIA ELECTRIC COMPANY PEACll BCrrTOM A'IDMIC POWER STATION -

R. D,1, Box 208 Delta, Pennsylvania 17314

_ nAcu morrtm-nos nwam or rxcnunce (717)456-7014 D. M. Smith Vice President -

9 May 15, 1989 Docket Nos. 50-277 50-278 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

SUBJECT:

' Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:

, Attached are twelve copies of the monthly operating report for Peach Bottom Units 2 and

- 3 for the month of April,1989 forwarded pursuant to Techmcal Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, e 76 -

DMS/MJB: cmc Attachment

- cc: J.T. Boettger, Public Service Electric & Gas T.M. Gerusky, Commonwealth of Pennsylvania T.P. Johnson, USNRC Senior Resident Inspector T.E. Magette, State of Maryland W.T. Russell., Administrator, Region I, USNRC H.C. Schwemm, Atlantic Electric J. Urban, Delmarva Power l;

CCN89.NRC 8905230172 890430 PDR R

ADOCK 05000277 PDC h\

l.

L-_--___-_-_-____-_-_-___.___

p NRC Monthly Operations Summary Peach Bottom Atomic Power Station April,1989 UNIT 2 The unit remained shut down through the 26th of April. Mode Switch was placed in startup on the 26th and the unit was in Power Ascension and the NRC required Operator Testing program through the end of the month.

)

l UNIT 3 The unit remained shut down during the report. period with modification activities in progress.

l l

l CCGl89NRC t

f

- - - - - - ---m--_.-__.-__.. _ _ _ _ _ _____ _ _ _ _ _ _ _ _ _ _ , _ _ _ _ , _ _ _ _ ]

i l L .,

. j 1

Docket No. 50-277 Attachment to l Monthly Operating l Report for April 1989 '

UNIT 2 REFUELING INFORMATION 1.~ Name of facility:

Peach Bottom Unit 2

2. Scheduled date for next refueling shutdown:

(1) Reload 7 completed (2) Reload 8 scheduled for August 31,1990

3. Scheduled date for restart following refueling:

(1) Completion of Power Ascension and Operator Testing targeted for August 3,1989.

(2) Restart following refueling scheduled for December 15,1990

4. Will refueling or resumption of operation therefore require a technical specification change or other license amendment? -

No.

~

If answer is yes, what, in general, will these be?

5. Scheduled date(s) for submitting proposed licensing action and supporting information:
6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Refueling completed.

. 7. The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblics (b) Fuel Pool- 1734 Fucl Assemblies,58 Fuct Rods i

CC0489,NRC

s Docket No. 50-277 ~

Attachment to Monthly Operating i Report for. April 1989 Page 2 i

UNIT 2 REFUELING INFORMATION (Continued)

C. The p;esent licensed spent fuel pool storage capacity and the size of any increase in licensed storage capady that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblics.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September,2003 without full core offload capability.

September,1997 with full core ofibd capability.

l.

CCN89.NRC

g. ,

l N <

Docket No. 50-278 I l- Attachment to l Monthly Operating Report for April 1989 UNIT 3 REFUELING INFORMATION 1'

1. Name of facility:

Peach Bottom Unit 3

2. Scheduled date for next refueling shutdown:

(1) Reload 7 in progress (Major Pipe Replacement Outage)

(2) Reload 8 scheduled for January 18,1991

3. Scheduled date for restart following refueling (1) Restart following refueling juled for September 28,1989 (2) Restart following refueling scheduled for May 4,1991

-4 Will refueling or resumption of operation thereafter require a technical specification change or other  !

license amendment?  !

Yes. .

If answer is yes, what, in general, will these be?

(1) Primary System Pipe Installation Modification Amendment (2) Cycle 8 Reload Amendment (3) Minimum SRM Count Amendment

5. . Scheduled date(s) for submitting proposed licensing action and supporting information:

(1) Primary System Piping Amendment submitted March 1988 (2) Cycic 8 Reload License Amendment submitted July 1988 (3) Minimum SRM Count Amendment submitted December 1988 CC0489,NRC

_ _ _ _..____________ _ _____________ __ _____.._ ___.._ .__________ _______.________._____________________________________._______________________________.____________.___J

O, .

l- .

l Docket No. 50-270 Attachment to Monthly Operating Report for April 1989

Page 2 UNIT 3 REFUELING INFORMATION (Continued)
6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Nonc expected.

7. The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool:

(a) Core 0 Fuel Assemblies (764 assemblics offloaded during outage)

(b) Fuel Pool- 2260 Fuel Assemblics,6 Fuel Rods

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed 'or 3819 fuel assemblies. This modification began on February 20,1987. The completion o,, - this modification has been rescheduled for the first quarter of 1990 to accommodate the tJnit 3 pipe replacement outage.

9. The projected date of the last refueling that can E discharged to the spent fuel pool assuming the present capacity:

With the currcat fuel pool capacity (prior to the completion of the fuel pool rcracking modification):

September,1996 withoat full core offload capability.

End of next cycle with full core offload capability (est. January,1991).

I With increased fuel pool capacity (subsequent to the completion of the fuel pool rcracking modification):

September,2fK)4 without full core offload capability.

September,1998 with full core offload capability.

CC0189.NRC

.. . 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE HAY 15, 1989 COMPANY PHILADELPHIA ELCCTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 457-7014 EXT. 4805 HONTH APRIL 1989 OAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWE-NET) (HWE-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0

.~

7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 16 0

= s

. + .

' AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE MAY 15, 1989 COMPANY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR

' REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 457-7014 EXT. 4805 MONTH APRIL 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAIL( POWER LEVEL l l

(PWE-NET) (MWE-NET) 1 0 17 0 2 0 18 0 3 3 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 ,

9 0 25 0 10 0 26 0 11 0 27 0 ,

12 0 28 0 t

13 0 29 0 l 14 0 30 0 15 0 16 0 i J

i l

4

)

OPERATING OATA REPORT 00CKET NO. 50 - 277 DATE MAY 15, 1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 457-7014 EXT. 4805 OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 2 NOTES: UNIT 2 IN POWER ASCENSION 2, REPORTING PERIOD: APRIL, 1989 AS OF APRIL 26, 1989
3. LICENSE 0 THERMAL POWER (MWT): 3293
4. NAMEPLATE RATING (GROSS MWE): 1152
5. DESIGN ELECTRICAL RATING (NET MWE): 1065
6. MAXIMUM OEPENDABLE CtfACITY (GROSS MWE): 1098
7. MAXIMUM OEPENDABLE CAPACITY (NET MWE): 1051
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POVER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): 35% POWER (368 MWE)
10. REASONS FOR RESTRICTIONS, IF ANY: NRC ORDER TMIS MONTH YR-TO-DATE CUMULATIVE
11. HOURS IN REPORTING FERIOD 719 2.879 129.935
12. NUMBER OF HOURS REACTOR WAS CRITICAL 5.4 5.4 74,202.2
13. REACTOR REtERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 0.0 0.0 71,866.8
15. UNIT RESERVE SHUTOOWN HOURS 0.0 0.0 0.0
16. GROS 3 THERMAL ENERGY GENERATED (MWH) 0 0 242,810,745
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 70,019,230
18. NET ELECTRICAL ENERGY GENERATED (MWH)

-4,713 *

-18,128 65,973.968 PAGE 1 0F 2 i

l

\

l f

l

1

j.

o . .- ,

OPERATINGDATAREPORT(CONT!1UED) DOCKET NO. 50 - 277

[. DATE MAY 15. 1989 THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 0.0 0.0 55.3
20. UNIT AVAILABILITY FACTOR 0.0 0.0 55.3  :

J

21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 0.0 49.0 22.'UNITCAPACITYFACTOR(USINGDERNET) 0.0 0.0 48.4
23. UNIT FORCED OUTAGE RATE 0.0 0.0 14.6
24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

REFUELING OUTAGE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICaif 02/18/74 COMMERCIAL OPERATION 07/05/74 l

PAGE 2 0F 2

________-___________________________a

OPERATING DATA REPORT t

DOCKET NO. 50 - 278 OATE MAY 15, 1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 457-7014 EXT. 4805 OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 3 NOTES: UNIT 3 REMAINED SHUT DOWN
2. REPORTING PERIOD: APRIL, 1989 UNDER NRC ORDER VITH REFUEL
3. LICENSED THERMAL POWER (MWT): 3293 AND EXTENDED PIPE REPLACEMENT
4. NAMEPLATE RAT!h6 (GROSS MWE): 1152 ACTIVITIES IN PROGRESS.
5. DESIGN ELECTRICAL RATING (NET MWE): 1065
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1035
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):

- 10. REASONS FOR RESTRICTIONS, IF ANY: .*

THIS MONTH YR-TD-DATE CUMULATIVE

11. HOURS IN REPORTING PER100 719 2,879 125,831
12. NUMBER OF HOURS REACTOR WAS C21TICAL 0 0 76,357.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 0.0 0.0 73.929.3
15. UNIT RESERVE SHUT 00WN HOURS 0.0 0.0 0.3
16. GRO S THERMAL ENERGY GENERATED (MWH) 0 0 215,278,901
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 70,611.432
18. NET ELECTRICAL ENERGY GENERATED (MWH) -4,713 *

-18.128 67.635,027

}

PAGE 1 0F 2 l

f

~, .

OPERATINGDATAREPORT(CONTINUED) DOCKET NO. 50 - 278 DATE MAY 15, 1989 THIS HONTH YR-TD-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 0.0 0.0 SP.8
20. UNIT AVAILABILITY FACTOR 0.0 0.0 ' 58.8
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 0.0 51.9
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 0.0 50.5
23. UNIT FORCED OUTAGE RATE - 0.0 0.0 13.3
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE AND DURATION OF EACH):

INDETERMINATE UNTIL NRC ORDER IS SATISFIED.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR 10 COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74

~

PAGE 2 0F 2 l'

f' _ _ -____ _ _ _ _ - _ - _ - _ _ . _ _ _ _ _ _ _ - - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ -

.t. .

+

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 UNIT NAME PEACH BOTTOM UNIT 2 DATE MAY 15, 1989 REPORT HONTH APRIL, 1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 457-7014 EXT. 480S METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT ~ CODE CODE ACTION TO NO. DATE (1) ,(HOURS) (2) REACTOR (3) REPORT # (4) (S) PREVENT RECURRENCE 7 890401 S 597.0 0 1 N/A ZZ ZZZZZZ NRC REQUIRED SHUTDOWN 7 890401 S 122.0 0 1 N/A ZZ ZZZZZZ NRC REQUIRED POWER ASr(NSION AND OPERATOR TESTING PROGRAM 719.0 (1)' (2) (3) (4)

F - FORCED REASON METHOD E/MIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING , 3 - AUTOMATIC SCRAM. EVENTREPORT(LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION l F - ADMINISTRATIVE (5) i G - OPERATIONAL ERROR (EXPLAIN)

! H - OTHER(EXPLAIN) EXHIBli ! - SAME SOURCE 1

l l

('

I l

i t- - _ _ _ _ _ _ _ _ _ _ _ __i

L .

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 278 UNIT NAME PEACH BOTTOM UNIT 3 DATE MAY 15, 1989 REPORT MONTH APRIL,.1989 CUMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 457-7014 EXT. 480S METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE- (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 7 890401 S 719.0 C 1 N/A RC FUELXX CONTINUATION OF REFUEL AND PIPE REPLACEMENT ACTIVITY.

719.0

.~.

1 (1) (2) , , .

(3) (4) ,,

F - FORCED REASON METHOD EXHIBli G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - 0THER (EXPLAlk) t !LE (NUREG 0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (S)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN) ExHIBli ! - SAME SOURCE l

m____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ __.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ . _ . _ _ _ _ _____________j