_ _ _ _ _ - -
W
1./
o
.[
Mf1519
.
. .
In Reply Refer To:
' Dockets:- 50-313/89-10
50-368/89-10
t
Arkansas Power & Light Company
ATTN: Mr. Gene Campbell
Vice President, Nuclear
Operations
P.-0. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. W. D. Johnson and R. C. Haag
of this office during the period March I through April 15, 1989, of activities.
authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One.
Units 1 and 2, and to the discussion of our findings with Mr. J. M. Levine and
other members of your staff at~ the conclusion of the inspection.
Areas examined during the' inspection included followup of events, followup.on
IE Bulletins and the anticipated transients without scram (ATWS) rule (10 CFR Part 50.62), operational safety verification, monthly maintenance observation,
monthly surveillance observation, followup on THI action items, and evaluation
of licensee quality assurance program implementation. Within these areas, the
-inspection consisted of selective examination of procedures and representative
records,-interviews with personnel, and observations by the NRC inspectors.
The findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of HRC requirements. Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section -2.201 of. the NRC's " Rules of Practice," Part 2, Title 10, Code of
-
Federal Regulations. Your response should be based on the specifics contained
in the Notice of Violation (Notice) enclosed with this letter.
The response directed by.this letter and the accompanying Notice is not subject
to the clearance procedures of the Office'of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
l
l
h
R1 :DRP/A
C:DRP/A
D:DR h
h0WDJohnson
DDChamberlain
LJCa)/89
f
lan
5/f/89
5//>/89
5/j$
8905220147 890515
1(
ADOCK 05000313
Q
i
_____-_-- _ - _ __- _-_--___ __-_____ _
-
,.
!-.
'
. .
.
n
i_
!.
- , -
Arkansas Power & Light Company
-2-
L:
,
Sh'ould you have any questions concerning this inspection, we will be pleased to
discess them with you.
Sincerely,
,
't
. ,
'
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-313/89-10
50-368/89-10
cc w/ enclosures:
Arkansas Nuclear One
ATTN:
J. M. Levine, Executive Direc60r
Nuclear Operations
P.O. Box 608
Russellyille, Arkansas 72801
Arkansas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
.j
. Robert D. Martin, RA
1
- RRI
1
- RPB-DRSS
- Section Chief (DRP/A)
Lisa Shea, RM/ALF
- RIV File-
- DRP
- MIS System
- RSTS Oserator
- Project Engineer, DRP/A
- C
Harauck, NRR Project Manager (MS: