.JUL 13 989 -
c
+
Docket'No;'50-245 336 50-423
. Northeast Nuclear Energy Company
- ATTN:
Mr.(E. J. Mroczka:
'i
~
, Se'nior'Vice President -. Nuclear t-o Engineering and Operations Group' i
p P. 0. Box 270-e Hartford,' Connecticut- 06141-0270 3
1 Gsntiemen:
Subject:
10 CFR 50.54 Quality Assurance Program Description Change Review
Reference:
Letter 813245 dated May. 25, 1989, E. J.. Mroczka to U.S. Nuclear
' Regulatory Commission, transmitting changes to the Northeast Utilities Quality Assurance Program Topical Report
. We have' received the referenced letter transmitting. Revision 12, of the Northeast Utilities Quality Assurance Program Topical Report. The Region I j
staff has: reviewed this submittal and found the changes to be acceptable as they~do not reduce your previous commitments to quality assurance.
The effectiveness of your QA Program and procedure implementation will f
continue to be the subject of routine-regional. inspections.
(215) 337-5244, l
If you hav'e any questions concerning the above, please call R. W. Winters on i
Sincerely, i
Originni Signed ByI P. K. Ea;;en Jacque P. Durr, Chief Engineering Branch Division of Reactor Safety i
l i
fk I \\
OFFICIAL RECORD COPY MILLSTONE QA PROGRAM - 0001.C.0 07/13/89 8907200025 890713
~
l
_w,,. r--
1 PDR ADOCK 05000245 h~'
~
P PDC
]
_____-_:_---------------------------------j
.x :..
JUL 131989 Northeast Nuclear Energy Co.
2 cc w/ enc 1:
W. D. Romberg, Vice President, Nuclear Operations S. E. Scace, Station Superintendent D. O. Nordquist, Director of Quality Services R. M. Kacich, Manager, Generation Facilities Licensing D. B. Miller, Station Superintendent, Haddam Neck Gerald Garfield, Esquire l
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of Connecticut NRR/QUAB bec w/ enc 1:
Region I Docket Room (with concurrences)
-h e g eire n t,S : t naftt, D R"A -(w/-o-eAc 1 )
DRP.Section Chief J. Shedlosky, SRI, Haddam Neck W. Raymond, SRI, Millstone 3 M. Boyle, LPM, NRR J. Dyer, E00 D. Jaffe, LPM, NRR S. Pindale, RI, Beaver Valley P. Eapen, DRS R. Winters, DRS Licensing Assistant, DRS RI:DRS R
S RI: J rs Ea'pfn hDur 7/t2 /89 7//3/89 7/U./89 0FFICIAL RECORD COPY MILLSTONE QA PROGRAM - 0001.1.0 07/12/89
____-.__-___-__A
NORTHEAST UTItJTIES cenerei Omcu. seioen street. seriin. Connecticut l
. mea w vum nicia r uwaa*
P.O BOX 270 a vo i..ria.o.,a c *'*
J (([,%,,7,",Z HARTFORD, CONNECTICUT 06141-0270 L
L (203) 665-5000 May 25, 1989 Docket Nos. 50-213 50-245 50-336 50-423 B13245 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen:
Haddam Neck Plant Millstone Nuclear Power Station, Unit Nos. 1, 2, and 3 Annual Reporting of Changes to the Quality Assurance Program Proposed Revision 12 to the Northeast Utilities Ouality Assurance Prooram Topical Report In accordance with 10CFR50.54(a)(3), transmitted herewith is proposed Revi-sion 12 of the Northeast Utilities Quality Assurance Program. (NVQAP) Topical Report (Attachment B) for your review and approval.
Preposed changes to the Topical Report are indicated by the vertical line in the right-hand margin.
The issue and basis for each change are detailed in Attachment A which is arranged in a sequence which coincides with the Topical Report sections.
Attachment A does not include minor editorial changes in accordance with 10CFR50.54(a)(3)(ii).
All changes included in proposed Revision 12 of the NVQAP Topical Report have the effect of upgrading our Quality Assurance Program whicS continues to meet the criteria of 10CFR50 Appendix B.
Please note that the draft NVQAP Topical Report is shown as Revision 12 without a date.
This draft will be issued as Revision 12 and dated the same as your effective date of approval when we receive it or sixty days following this submittal as prescribed in 10CFR50.54(a)(3)(iv).
Q k-h
--^
l-
+
7 U.S. Nuclear Regulatory Commission B13245/Page 2 May 25, 1989 If you have any _ questions-regarding-this submittal, please contact-Mr. Donald O. Nordquist at (203) 665-5447.
Very truly yours, NORTHEAST UTILITIES SERVICE COMPANY ds /
en$r resid t W. T.' Russell, Region I Administrator ec:
M. L. Boyle, NRC-Project Manager, Millstone Unit No. 1 G. S. Vissing, NRC Project' Manager, Millstone Unit No. 2 D. H. Jaffe, NRC Project Manager, Millstone Unit No. 3 A. B. Wang, NRC Project Manager, Haddam Neck Plant
~W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1, 2, and 3 J. T. Shedlosky,. Senior Resident Inspector, Haddam Neck Plant-P. K. Eapen, Chief, Quality Assurance Section,' Region 1
_ _ _ _ _ _.