. _ - _ _ _ _ _ _ - _ _ -
Gr :n; ; ir n-n '
1 3r
+
n.,'
- A j
y i( h j
e si $ '
ma e r
a y
is e, c. y p, e B.m i, r e r-
,s i% Wa 1.' +
'Ju 5 in * ' /ii
-~fi s k
L r
w,c.Ha m on,m MSV-00033 sena v.w %."
1729R us w oc "
May 10, 1989 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 REVISION 3 TO INSERVICE INSPECTION PROGRAM Gentlemen:
In accordance with the requirements of Technical Specification 4.0.5 concerning surveillance requirements, Georgia Power Company (GPC) submits for NRC review and approval five copies of Revision 3 of the Plant Vogtle Unit 1 Inservice Inspection (ISI)
- Program, ISI-P-006.
The enclosed documents supercede portions of the original ISI program document previously submitted.
Specifically, three relief requests, RR-52, RR-63, and RR-54 are being added to the ISI program document.
A summary of the changes resulting from Revision 3 is also enclosed.
It should be noted that Relief Requests RR-52 and RR-53 were generated as a result < T examination limitations observed while examining the i
affected compor.o during inservice inspection activities condt,.ed during the Fall 1988 maintenance / refueling outage.
Certain of the limitations discussed in the enclosed ISI program docunent revision were previously identified to the NRC, e.g.,
Relief Request RR-10 in Revision 2 of Preservice Inspection Program document ISI-P-002 is similar in nature to Relief Request RR-52.
It should be further noted that Relief Request RR-52 was referenced in the " Owner's Data Report for Inservice Inspection" which was submitted to the NRC by GPC letter ELV-00266 dated February 22, 1989.
Should additional information or a meeting to discuss the enclosed ISI program revision be required, please contact this office.
Sincerely, 1
au HW l
W. G. Hairston, III l
l l' j 8905190486 890510 4
PDR ACOCK 05000424 Q
PDC j
L_ _ ___-
e MSV-00033 Page 2 JAE/gb
Enclosure:
Revision 3 to.Vogtle Unit 1 ISI Program, ISI-P-006 cc:
Georgia Power Company Mr. P. D. Rice Mr. C. K. McCoy Mr. G. Bockhold, Jr.
NORMS U. S. Nuclear Regulatory Commission Mr. H. L. Ernst, Acting Regional Administrator Mr. J. B. Hopkins, Licensing Project Manager, NRR (2 copies)
Mr. J. F. Rogge, Senior Resident Inspector-0perations, Vogtle w