Supplemental Deficiency Rept CP-87-03 Re Installation of safety-related 6.9 Kv Switchgear on Structural Embedments Not Level.Initially Reported on 870316.Testing Rescheduled for Completion by 890901 for Unit 1
ML20246N613
Person / Time
Site: Comanche Peak  
Issue date: 03/20/1989
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CP-87-03, CP-87-3, TXX-89144, NUDOCS 8903270412
Download: ML20246N613 (1)


Text

- _ _ _ - -

^'

o. 4.

==

--F """

Log # TXX-89144 C.

C File # 10110 C

C 908.3 7UELECTRIC Ref. # 10CFR50.55(e)

-March 20, 1989 Executive Vice President i

U. S. Nuclear Regulatory Commission Attn:. Document Control Desk-Washington, D. C.

20555

SUBJECT:

, COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 6.9 KV SWITCHGEAR INSTALLATION SDAR:.CP-87-03 (SUPPLEMENTAL REPORT)

Centlemen:

.' On. Ma rc h 16, 1987, TV Electric notified you by letter logged TXX-6334 of a reportable deficiency. involving the installation of the safety related 6.9 KV switchgear on structural embedments which were not level.

The latest report on this issue, logged TXX-88354, was submitted March 29, 1988.

This is a

. supplemental report submitted to update the corrective action completion schedule.

TXX-88354 indicated that testing for the switchgear would be completed by March 20,.1989. As described in TXX-6334, the testing being performed is the normal pre-operational testing.

This testing has been rescheduled for completion by_ September 1,1989 for Unit 1 and prior to Unit 2 fuel load for Unit 2.

The test report will be available on site following completion of the tests.

Sincerely,

(

William J.

ahill, Jr.

WJH/ddm c.- Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 8903270412 890320 PDR ADOCK 05000445 g

PNU e

h' 400 North Olive Street LB 61 Da!!as, Texas 75201 1 0

,