- _ _ _ - -
^'
- o. 4.
==
--F """
Log # TXX-89144 C.
C File # 10110 C
C 908.3 7UELECTRIC Ref. # 10CFR50.55(e)
-March 20, 1989 Executive Vice President i
U. S. Nuclear Regulatory Commission Attn:. Document Control Desk-Washington, D. C.
20555
SUBJECT:
, COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 6.9 KV SWITCHGEAR INSTALLATION SDAR:.CP-87-03 (SUPPLEMENTAL REPORT)
Centlemen:
.' On. Ma rc h 16, 1987, TV Electric notified you by letter logged TXX-6334 of a reportable deficiency. involving the installation of the safety related 6.9 KV switchgear on structural embedments which were not level.
The latest report on this issue, logged TXX-88354, was submitted March 29, 1988.
This is a
. supplemental report submitted to update the corrective action completion schedule.
TXX-88354 indicated that testing for the switchgear would be completed by March 20,.1989. As described in TXX-6334, the testing being performed is the normal pre-operational testing.
This testing has been rescheduled for completion by_ September 1,1989 for Unit 1 and prior to Unit 2 fuel load for Unit 2.
The test report will be available on site following completion of the tests.
Sincerely,
(
William J.
ahill, Jr.
WJH/ddm c.- Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 8903270412 890320 PDR ADOCK 05000445 g
PNU e
h' 400 North Olive Street LB 61 Da!!as, Texas 75201 1 0
,