ML20246N438

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Inservice Insp Rept of Unit 2 Catawba 1987 Refueling Outage 1
ML20246N438
Person / Time
Site: Catawba 
Issue date: 08/31/1989
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20246N444 List:
References
NUDOCS 8909080126
Download: ML20246N438 (1)


Text

n;z

.y m-J j6;b i:

hi ~

k

. p ;, _

j..

. Duxe POWER COMPAhT

s

- P.O. box 33189

,3 ;

CHARIRTTE, N.C. 28242 VM _

-MALB. TUCKER

.,.g.,,,,on

. veos emmasaser (yo4) 3y3 433g musu. sam reposamen s

August 31, 1989

-Document' Control Desk

- U. S. Nuclear Regulatory Cour.ission -

Washington,:D. C.

20555

Subject:

Catawba Nuclear Station, Unit 2

-Docket'No. 50-414' End of Cycle l' Inservice Inspection Report Update

.. Gentlemen:

My May 6, 1988 letter to the Document Control Desk transmitted the Unit 2

'end-of-cycle 1 Inservice' Inspection Report. Please find attached Revision'l'to=

the end-of-cycle 1-Inservice Inspection Report.

This Inservice Inspection was performed in accordancu with Section XI of the ASME Boiler and.Pressurc Vessel Code and applicable addenda.

Ve'ry truly yours, kV 4

H. B.-Tucater

' Attachment"

~

JGT/4/U2C11 SIR xc:

Mr. S. D. Ebneter,' Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. W. 7. Orders NRC Resident Inspector Catawba Nuclear Station f

f o4(L lL s'

g 8909080126 890831.

(

PDR.ADOCK 0500041,4 g

o.

PDC C

__ = ___ _____ _ __________

_____________________________________________.__________.______o