Forwards Insp Repts 50-327/89-10 & 50-328/89-10 on 890316-20.No Violations or Deviations Noted.Due to Excessive Leakage Through Penetration X-59,Mar 1989 Containment Integrated Leak Rate Test Classified as Failed Test
ML20246N029
Person / Time
Site: Sequoyah  
Issue date: 05/04/1989
From: Wilson B
Office of Nuclear Reactor Regulation
To: Kingsley O
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20246N033 List:
References
NUDOCS 8905190329
Download: ML20246N029 (2)


See also: IR 05000327/1989010

Text

_ _ _ - - _ _ _ _ _ _

_

_-

n

y

..:

.

d

^

MAY 041988

.

Docket Nos. 50-327, 50-328

License Nos. DPR-77, DPR-79

Mr. Oliver D. Kingsley, Jr.

Senior Vice President, Nuclear Power

Tennessee Valley Authority

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Dear Mr. Kingsley:

SUBJECT:' NRC INSPECTION REPORT NOS. 50-327/89-10 AND 50-328/89-10

~

This refers.to the Nuclear Regulatory Commission (NRC) inspection conducted by

H. L. Whitener on March 16-20, 1989.

The inspection included a review of

activities authorized for your Sequoyah facility pertaining to containment

integrated leak rate testing. At the conclusion of the inspection, the findings

were discussed with those members of your staff identified in the enclosed

Inspection Report.

Areas examined during the inspection are identified in the report.

Wi thin

these areas, the inspection consisted of selective examinations of procedures

and- representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations - or deviations were

identified.

However, due to excessive leakage through penetration X-59, the

March 1989 containment integrated leak rate test (CILRT) for Unit 2 was

this is the second co,s CILRT (November 1984) on

In that the previou

classified as a failed test.

nsecutive test failure.

Unit 2 was a failed test,

10 CFR 50, Appendix J requires that when two consecutive CILRT test failures

occur, CILRTs are to be performed at each refueling outage until two consecutive

tests are successful.

Our classification of a failed CILRT does not prohibit

you from seeking relief from the requirement by submitting your justification

for an alternate corrective plan.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will- be placed in the NRC Public Document Room.

I

l

l

h

P

z6,l

'

1

_ _ _ __ _ _ _ _ _ _ _ _

.

u g og ggg

-

..

1

Mr.' Oliver D.-Kingsley, Jr.

2

_

.

.

Should you .have any questions concerning this letter, please contact us.

Sincerely,

1>

,

& p

VakwL

Bruce A. Wilson, Assistant

Director for Inspet. tion Programs

TVA Projects Division

Office of Nuclear Reactor Regulation

Enclosure:

NRC Inspection Report

cc w/ encl:

F. L. Moreadith, Vice President,

Nuclear Engineering

'J.

L. LaPoint, Site Director

Sequoyah Nuclear Plant'

R. L. Gridley,; Director

Nuclear Safety and Licensing

M. ' Burzynski, Acting. Site

Licensing Manager

TVA Representative, Rockville Office

General Counsel, TVA

State of Tennessee

bec w/ encl:

S. D. Ebneter, RII

D. M. Crutchfield, NRR

B. D.. Liaw, NRR

S. C. Black, NRR

R. C. Pierson, NRR

J. B. Brady, NRR/RII

B. B. Desai, NRR/RII

J. Rutberg, 0GC

NRC Resident Inspector

NRC Document Control Desk

i

l

?.

>

j0 LWWson

!_

HWhitener:tm

ABelisle

CJu ian

/89

/89

04/u/89

04/y/89

p4'$

04/gj/M

5/i