Advises That Preoperational Test Deferrals,Described in Sser 6 (NUREG-0797),Section 14, Initial Test Program, No Longer Valid.No Preoperational Tests Required to Be Deferred Beyond Unit 1 Fuel Load
ML20246M716
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/14/1989
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0797, RTR-NUREG-797 TXX-89460, NUDOCS 8907190199
Download: ML20246M716 (1)


Text

.

{

a M

"""l Log # TXX 69460 1 C File # 914.2

= ""~

10010 7tlELECTR/C Ref. # 10CFR50.34(b)(a)(iii)

Wmiam J. Cabm. Jr.

Executive Vice President U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 l

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 DEFERRAL OF PRE 0PERATIONAL TESTING REF: 1) TUGCo letter TXX-4169 from B. R. Clement to H. R. Denton dated May 15, 1984

2) TUGCo letter TXX-4182 from B. R. Clement to H. R. Denton l dated May 29, 1984 TUGCo letter TXX-4191 from B. R. Clement to H. R. Denton 3) dated June 5, 1984
4) TUGCo letter TXX-4199 from B. R. Clement to H. R. Denton dated June 8, 1984
5) TUGCo letted TXX-4202 from B. R. Clement to H. R. Denton dated June 15, 1984 Gentlemen:

The preoperational test deferrals as described in References 1 through 5 and NUREG-0797, Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2, Supplement No. 6, Section 14 INITIAL TEST PROGRAM are no longer valid. At this time, TU Electric has not identified any preoperational test that needs to be deferred past Unit 1 fuel loed.

Sincerely, William J. Cahill, Jr.

By:

D. R. Woodlan Docket Licensing Manager RSB/vid c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)

Mr. J. H. Wilson, OSP-NRC 8907290199 890714 PDR E ADOCK 05000445 PDC 400 North Olive Street LB81 Dallas, Texas 75201 OK9 tt6