4
,~.tl o.
N '
4 M
Log: # TXX-89648 O
File # 10035-r
=
10305 Ref.. # 10CFR55 M# ELECTRIC.
September.-1, 1989 Executive Vice President
'Mr.LKenneth E. Perkins Chief,. Operator Licensing Branch U. S. Nuclear Regulatory Commission
'OWFN-10D -
Washington, D. C.
20555 r
SUBJECT:
COMANCHE PEIK STEAM ELECTRIC STATION (CPSES)
DOCKET NO. 50-445 RESPONSE TO GENERIC LETTER 89-12 4
OPERATOR LICENSING EXAMINATION SCHEDULE
Dear Mr. Perkins:
Enclosed-are our. proposed schedules for Operator Licensing Examinations and 7
Requalification Examinations. These proposed' schedules provide the requested information regarding anticipated dates for the examinations and the number of.
personnel expected to take an examination on that date.
Very truly yours.
Y.7, Y pf' W. J. Cahill, Jr.
By:
Mi a
Roger"D. Walker" Manager, Nuclear Licensing GLB/smp Enclosures (2) c - Mr. R.
D.~ Martin, Region IV Mr. J. L. Pellet. Region IV Mr. J. H. iillson, NRR-OSP Resident g ectotz CPSES (3) (clo)
. r
'4
.V fY 400Nonh Olive Street LB 81 Dallas, Texas 75201 L___
t p
,i.
- ~
. Enclosure 1 9
PROPOSED OPERATOR LICt.NSING EXAMINATION SCHEDULE FDPMAT Facility : CPSES NRC Region IV FY 1990
'FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90)(10/1/90-9/30/91)(10/1/91-9/30/92)(10/1/92-9/30/93)
-1.
' Assigned Date (GL89-03)
NOVEMBER NOVEMBER NOVEMBER NOVEMBER
- RO O
8 4
- SRO Instant
'O 2
2 2
- SRO Upgrade 0
6 2
2 iSRO Limited 0
0 0
0 2.
Assigned Date (GL'89-03)
JUNE JUNE JUNE JUNE
- RO O
6 6
6 iSR0 Instant -
0 0
0 0
- SRO Upgrade 6
2 2
2
- SRO Limited 0
0 0
0
'Please indicate initial cold license examinations by placing an asterisk (*) by the date.
Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two asterisks (**).
(for example, if Unit 1 is in operation and Unit 2 is approaching fuel load, and three RO' candidates with'no prev 1ous license are to be examined on both Units 1 and 2, and five RO candidates licensed on Unit I are~to be examined to extend their licenses toUnit2,thenindicate"R03,5**.")
8
l' Esclosure 2 PROPOSED ItEWALIFICAT10ll SCHEDULE FORitAT FACILITY:CPSES NRC RE610N IV Planned Simulation Facillty Ceritfication/ Approval Date: 7/31/90 FY 1990 FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90)
(10/1/90-9/30/91)
(10/1/91-9/30/92)
(10/1/92-9/30/93)
WEEK 1 6/4/90 5/20/91 5/18/92 5/28193 WEEK 2 6/11/90 5/27/91 5/25/92 5/31/93 WEEK 3 6/18/90 6/3/91 6/1/92 6/7/93 WEEK 4 6/25/90 6/10/91 6/8/92 6/14/93 MEK 5 7/2/90 6/17/91 6/15/92 6/21/93 WEEK 6 7/9/90 6/24/91 6/22/92 6/28/93
.____--__-_______-___m