ML20246M273
| ML20246M273 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 03/17/1989 |
| From: | Sieber J DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-88-17, NUDOCS 8903270089 | |
| Download: ML20246M273 (2) | |
Text
g.
.u.
~
q r Whey Power Stauon l
Shippmgpor:, PA 15077-0004 l
I l
fc7AEEE"sucw, croup m2> eos2ss March 17, 1989 l
l U.
S.
Nuclear Regulatory Commission j
Attn:
Document Control Desk Washington, DC 20555
Reference:
Beaver Valley Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Supplemental Response to Generic Letter 88-17, Program Enhancements
' Gentlemen:
Our letter dated February 23, 1989, provided our response to your Programmed Enhancements identified in Generic Letter 88-17, Loss of Decay Heat Removal.
The schedule requested by the NRC, as applicable to the Beaver Valley Units,-is to complete programmed enhancements consisting of hardware installation and/or modification by the end of the second refueling outage following receipt of this Generic Letter.
In response to programmed enhancement No.
1, Instrumentation, we indicated the target date for completing hardware modifications for RCS level indication as being the eighth refueling outage for Unit No.
1 and the second refueling outage for Unit No.
2.
- However, we included expected dates for these outages which were incorrect.
The dates provided were for the seventh and first refueling for Unit No. 1 and No.
2, respectively.
The correct dates for the eighth and second refueling outages are as follows:
Beaver Valley Unit No. 1 eighth refueling outage is scheduled to begin April 1, 1991.
Beaver Valley Unit No. 2 second refueling outage is scheduled to begin September 1, 1990.
fDR903270089 890317 0'
p ADOCK 05000334 pdc IO
.J. -
.s>.
Beavor Valley' Power Station, Unit Nos. 1 & 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 g
Supplemental Response to Generic Letter 88-17,
. Program Enhancements Page 2 W
This schedule is in agreement with that requested by the NRC.
j If you have any questions, please contact me or members of my staff.
Very truly yours,
)
05 C)
{
- \\
J.
D.
Sieber 1
Vice President Nuclear Group l
cc:
Mr. J.
Beall, Sr. Resident Inspector Mr. W. T. Russell, NRC Region I Administrator Mr.
P.
Tam, Sr. Project Manager Director, Safety Evaluation & Control (VEPCO)
_ _ _ _ _ -__ - _____ __