ML20246M074
| ML20246M074 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/30/1989 |
| From: | Blosser J, Mccann R UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| ULNRC-2035, NUDOCS 8907190055 | |
| Download: ML20246M074 (6) | |
Text
_.
y n.
,l..
.
- a E_
., : f
- G g a
UNION EU!CTINC COMPANY
' ColW Ront.
July 10,1989 o
4 Nuclear. Regulatory Commission Document Control Desk Washington, DC 20555 ULNRC-2035
Dear Sir:
4
. g.
DOCKET NUMBER 50-483-CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT JUNE 1989 The~ enclosed Monthly Operating Report for June 1989 is submitted I
pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifica-tions.
. D. Blosser Manager, Callaway Plant JDB/DEY/RDA/ TAM /RJM/lrj Enclosure cc: Distribution attached
\\
~
8907190055 890630 PDR ADOCK 050004g3 R
PDC ZE1.
' Molting Address:RO. Box 620 Fulton,MO65251
'f I
cc distribution for ULNRC-2035 with enclosures Mr. Robert DeFayette, Chief Project Section 1A U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. Thomas Alexion (2 copies)
Cffice of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop P-316 7920 Norfolk Avenue Bethesda, MD 20014 NRC Resident Inspector Manager Electric Department.
Missouri Public Service Commission P. O. Box 360 Jefferson City, MO 65102
__________.___________.d
DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 7-10-89 COMPLETED BY R. J. McCann TELEPHONE 314-676-8243 PART A OPERATION.9
SUMMARY
l The plant operated at approximately 100% power with the followng exceptions.
On 6/8/89, the plant was shutdown to replace a power range detector (N41).
Pouer operation resumed on 6/9/89.
Due to a request by load dispatch, the plant held at.70% power until 6/11/89.
On 6/23/89, the plant was shutdown due to a control rod system malfunction.
Power operation resumed on 6/24/89.
PART B PORV AND SAFETY VALVE
SUMMARY
None CA-#804 Page 1 of 4 08/18/88 EDP-ZZ-04105
?
3 e,*,<
Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-483 UNIT CALLAWAY UNIT 1 DATE 7-10-89 COMPLETED BY R. J. McCann TELEPHONE 314-676-8243 MONTH:
AVERAG3 DAILY POWER. LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1 1,156 17 1,164 2
1,161 18 1,163, 3
1,159 19 1,157 4
1,161 20 1,154 5
1,162 21 1,151 6
1,157 22 1,146 7
1,120 23 576 8
55 24 206 9
29-25 993 10 684 26 1,144 11 846 27 1,158 12 1,152 28 1,156 13 1,164 29 1,163 14 1,170 30 1,161 15 1,1^78 31 16 1,170 1
I CA-4tB04 Page 2 of 4 08/18/88 EDP-ZZ-04105
) L..,
Part D
. ;)
OPERATING DATA REPORT i
E DOCKET NO.
50-483 UNIT NAME CALLAWAY' UNIT l' DATE 7-10-89 COMPLETED BY-R. J. McCann TELEPIIONE 314-676-8243 OPERATING STATUS (YTD CUM) 1.
REPORTING PERIOD: June 1989 GROSS HOURS IN REPORTING PERIOD: 720 4,343 39,684.5
- 2..' CURRENTLY AUTHORIZED POWER LEVEL (rNt): 3565 MAX. DEPEND. CAPACITY (bMe-Net):
1118 DESIGN ELECTRICAL RATING -(tNe-Net):
1171 t
3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (tNe-Net):
100%
4.
REASONS FOR RESTRICTION lIF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL............
679.1 3,064.6 33,563.4
'6.
REACTOR RESERVE SHUTDOWN H0URS....................
0 0
0 7.
HOURS GENERATOR ON LINE...........................
663.8 2,999.9 32,584.4 8.
UNIT RESERVE SHUTD0dN H0URS.......................
0 0
0 9.
GROSS THERMAL ENERGY GENERATED (FMH).............. 2,230,340 10,205,406 106,092,017
- 10. GROSS ELECTRICAL ENERGY GENERATED (FNH)...........
758,570 3,482,169 35,915,719
- 11. NET ELECTRICAL ENERGY GENERATED (FMH).............
720,297 3,307,883 34,052,084
- 12. REACTOR SERVICE FACT 0R............................
94.3 70.6 84.6
- 13. REACTOR AVAILABILITY FACT 0R..............
94.3 70.6 84.6
- 14. UNIT SERVICE FACT 0R...............................
92.2 69.1 82.1
- 15. UNIT AVAILABILITY FACTCR...........................
92.2 69.1 82.1
- 16. UNIT CAPACITY FACTOR (Using MDC)..................
89.5 68.1 76.8
- 17. UNIT CAPACITY FACTOR (Using Design FNc)...........
85.4 65.0 73.3
- 18. UNIT FORCED OUTAGE RATE....
2.7 1.01 3.76
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 20. IF SHU~' DOVN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP 1
CA-#804 Page 3 of 4 08/18/88 EDP-ZZ-04105 i
N a2
=
U C8 d
t -
m r.
C -
ne sn eo Y9M6 om eo t
- A 7
ru ui sd
'3W-8.6 ts qt ye 8A ue ea sm Qd -
S er rr u
4LLl 4
T n
e d
0A-1 N
n ap oe 5CZK3 E
eo o
rr M
gi o
M nt tr l n O
aa e
oo C
rr ew ri
/
e uo tt
'.EEYE S
rp dp na OMTBN N
eo or NAA O O
w
%l ce NDDH I
or 0l p
T
- EP T
w F
t KI EL A
eo t -.
r CN LE cP a
9 ee OU PT E
a 8
uw D
M V
l dh/ do O
I p,
l c1 P
C T
e) et1 n
C r1 ha/
w E
4 p6 o
R oN rs dn.
R t(.
ein to O
9 wdo ui C
nr8 o ht,
wo/
pdd sc9 ot9 ae n8 dc/ tom tu/
te6 nl u nf4 ut a
s at2 hen l
ye l 3/
Sdo Fbr Pm6 M)
AN RI MCA S
ASL N
R P
O CCX I
RR SIE T
NOE T(
C W W LLA U
F ORO AAMR D
ODOP UUOE E
T DNNTH R
DGCG OAAUT ONAN HMMAO R
HIEI 1
h 2
T W
ET U
M1234:::
E TTRC E:
EO MUED P
HHE t
STR rD aN i:
PA T'
N
)
)
S O
N N
N M
I I
W A
A O
T L
L D
R P
N P
T O
X OD X
U P
N E
I N E
H E
O TAN
(
(
S.
R S
C O A
E I GI R
T E
R RNT O
I R
A H
A U
TIA R)
N LT SNNERN U
I S EII VE' AE RAMI A
FT R A T.L L YTXfAP TRGR ERNX NL NONOR TOE O
E ITOESI(
IS 6
9 I NUUREIRE RO 3
O 1
NUI FCECMEH UH OQAEEPI DPT D[
SEMRROLAOO A
E :: : :: : :
RADCDE FCH:
D E
S F
FS 9
9 9
8 8
E 8
/
/
T
/
0 3
A 8
1 2
D
/
/
/
Y:
6 6
6 RA M
M A6 7
8 U
N 0
0 0
S
('