Supplemental Deficiency Rept CP-87-055 Re Containment Spray Pump Recirculation Piping.Initially Reported on 871208. Replacement of Affected Piping Continuing.Mods Will Be Completed Prior to Fuel Load for Unit 1
ML20246M024
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/08/1989
From: Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CP-87-055, CP-87-55, TXX-89248, NUDOCS 8905190015
Download: ML20246M024 (1)


Text

__ _.

s

.JE"EflE

". e -

""" """ 1.og # TXX-89248

-_ .~ File # 10110 r C 906.2 900*5 TUB' ~'CTRIC Ref. # 10CFR50.55(e)

W. J. Cahm May 8, 1989 becstive Vice President 1

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATICH (CPSES)

DOCKET N05. 50-445 AND 50-446 CONTAINMENT SPRAY PUMP RECIRCULATION PIPING SDAR: CP-87-055 (SUPPLEMENTAL REPORT)

Gentlemen:

On December 8,1987, TV Electric notified the (IRC via report logged TXX-7046 of a reportable item involving the containment spray pump recirculation piping. The latest report on this subject was logged TXX-88850, dated December 16, 1988. The purpose of this report is to revise the schedule for implementation of corrective action.

The replacement of the affected containment spray pump recirculation piping with ASME III Class 2 pipe and seismic Category I supports is continuing.

These modifications will be completed prior to fuel load for Unit 1. The Unit 2 completion schedule remains unchanged.

Sincerely, William J. Cahill, Jr.

8905190015 890508 PDR ADOCK 05000445 S PNU 1 By:

13. R. Triood I an Docket 1.icensing Manager CBC/vid  ;

I c - Mr. R. D. Martin, Region IV gy)

Resident Inspectors, (CPSES) (3) i l o I

l l

4tX) Nonh Oltre S:reet f.B Mi Dallas, Texas 7D01