Text
...
..,y--
4 i
j,? -f..
~0.*
Telephane (508) 7796711
- YANKEE ATOMICELECTRIC COMPANY
if 580 Main Street, Bolton, Massachusetts 01740-1398
^
. Yum, es July 12, 1989 O ~I10 BRUCE L DRAWBRIDGE N4M vce pResoeNT no MANAOER OF OPERATONS United States Nuclear Regulatory Commission-Document Control-Desk Washington, DC 20555
References:
(a)
License No. DPR-3 (Docket No. 50-29)'
(b)
USNRC Letter to All Licensees,. dated November 1,
1983, Generic Letter 83-37 (c ).
USNRC Letter to YAEC dated May 16, 1985, Inspection No. 50-29/85-05
Subject:
Proposed Technical Specification Changes to Incorporate the Main Steam'Line Monitors and Primary Vent Stack (PVS) Noble Gas Monitor.
Dear Sir:
Pursuant to Section 50.90 of the Commission's Rules and Regulations, the Yankee Atomic Electric Company (YAEC) hereby requests the authorization to make the following changes.
Proposed Chance Reference is made'to the Technical Specifications of L~icense No. DPR-3 of the Yankee Nuclear Power Station (YNPS).
We propose to modify the Technical Specifications as described-below:
1.
Modify Page 3/4 3-19, Table 3.3-4 to add the steam line monitors and primary vent stack (noble gas) monitor to the listing of radiation monitoring instrumentation, and 2.
Modify Page 3/4 3-21, Table 4.3-3 to add the steam
.g line monitors and primary vent stack (noble gas) nop monitor surveillance requirements.
- o c.,
50g Description of Chance C0 0 l
g, This change incorporates equipment installed to g.
specificsily meet the requirements of NUREG-0737, Item op II.F.1-1, Attachment 1 for the monitoring of noble gas in Y
plant ef f.' u en t s.
The proposed Technical Specifications have
)
b been modeled in accordance with the Staff guidance provided in Reference.' b t.
y y 4,n.4, #0144/u M
i
'I'
- I iso oo
l 4
V
,p 9
- 1 Reason and Basis for Chance NUREG-0737, Item II.F.'l-1 required the installation of noble gas monitors with an extended range designed to function during nortaal operation and~ accident conditions.
l This requirement was met by modifying = existing sampling arrangements as'well as by installing new equipment.
1.
The noble gas effluent monitoring system, including the high range PVS noble gas monitor, and four main steam line l
monitors.has been evaluated by the Staff for conformance with NRC~ criteria and determined to meet the requirements
- contained in the NUREG.
A description of the installed equipment and the Staff's evaluation is provided in Reference (c).
I Safety Consideration This change is requested in order to add requirements for.the noble gas effluent monitoring equipment installed.to meet the requirements of NUREG-0737, Item II.F.1-1.
-This-change incorporates the operability and surveillance requirements for the approved equipment in accordance with model Technical Specifications provided by the Staff in i
As such this proposed change would not
.l.
Involve a significant increase in the probability or consequences of an accident previously evaluated.
This change incorporates equipment used to-assess plant conditions and designed to function during accident conditions.
The installed equipment has been determined' l
to conform to Staff criteria.
This change will not I
increase the probability or. consequences of an accident previously evaluated.
2.
Create the possibility of a new or different kind of accident.from any previously evaluated.
This change is administrative in nature and incorporates limitations and i
surveillance modeled from Staff guidance, the implementation of which will not create the possibility j
of a new or different kind of accident.
The installed l
equipment is in response to the requirements of NUREG-0737.
3.
Involve a significant reduction i n a margin of safety.
As a new Technical Specification there is no reduction in a margin of safety.
The noble gas monitors are utilized to assess plant conditions, during and following an accident.
These monitors are operable in Modes 1-4, but are not required for safe shutdown of the plant.
In case of failure of the monitor, appropriate actions to be taken in a reasonable period of time have been delineated in accordance with Staff criteria.
J
..i.
s p
- Based'on the considerations contained herein, it is concluded that there is reasonable assurance that operation of the Yankee plant, consistent with the proposed Technical Specification, will not endanger the health and safety of the public.
This proposed change has been reviewed by-the Nuclear Safety Audit and Review Committee.
Fee An application fee of $150.00 is enclosed in accordance.
with 10CFR170.21.
Schedule of Chance This change to the Yankee Technical Specifications will be implemented upon Commission approval.
A timely review and approval of this submittal would be appreciated.
We trust that you will find this submittal satisfactory; however, should you desire additional information, please contact us.
Very t -Ty yo rs, vat 'EE ATOM ELECTRIC COMPANY l /4?k B.
L.
Drawbr' Vice President / Manager of Operations l
BLD/25.250 l
COMMONWEALTH OF MASSACHUSETTS)
)ss MIDDLESEX COUNTY
)
1 Then personally appeared before me, B.
L.
Drawbridge, who, being duly sworn, did state that he is Vice President and Manager of Operations of Yankee Ato.mic Electric Company, 1
that he is duly authorized to execute and file the foregoing document in the name and on the behalf of Yankee Atomic Electric Company and that the statemer,ts therein are true to the best of his knowledge and belief.
l 1
+ Y OmtmOIw l
Helen D.
Sammarco Notary Public My Commission Expires November 7,
1991