ML20246L015

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-029/89-05 on 890403-07.No Violations Noted.Concerns Raised Re Actions to Resolve Insp Findings on Generic Ltr 83-28,Item 2.2.2, Vendor Interface
ML20246L015
Person / Time
Site: Yankee Rowe
Issue date: 05/05/1989
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Drawbridge B
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML20246L021 List:
References
GL-83-28, NUDOCS 8905180217
Download: ML20246L015 (2)


See also: IR 05000029/1989005

Text

_ _ - _ _

_ _ _ _ _ _ _ _ _ _

f.

. . .

  • ' '

' g utsu

_

g

0,,

UNITED STATES.

!

'

NUCLEAR REGULATORY COMMISSION

.

,h.

E

REGION 1

[.

~

o[

' 475 ALLENDALE ROAD

L

XING OF PRUSSIA, PENNSYLVANIA 194o6

!

AIAY 5

1989

Docket No.50-029

' Yankee Atomic Electric Company

ATTN: Mr ' Bruce L. Drawbridge

)

Vice President and Manager

'

of Operations

580 Main Street

Bolton,-Massachusetts 01740-1398

Gentlemen:

Subject: ' Inspection No. 50-029/89-05

This refers to the routine safety inspection conducted by Mr. M. Dev of this

office on April 3 - 7, 1989 at Yankee Nuclear Power Station,'Rowe, Massachusetts

of activities authorized by NRC License No. DPR-3 and to the discussions of our

findings held by Mr. Dev with Mr. T. Henderson of ynur staff at the conclusion

of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures ar.d representative

records, interview with personnel, and observations by.the inspector.

Within the scope of this inspection no violations were observed.

However, your

attention is directed to the concerns discussed in paragraph 2.0 of the report.

Your actions to resolve the NRC previous' inspection finding (50-029/85-12-02)

concerning Generic Letter (GL) 83-28, Item 2.2.2, Vendor. Interface, and to

implement corrective actions have been protracted. Additional management

attention appears warranted to ensure timely completion of licensee

commitments.

Your cooperation with us in this matter is appreciated.

Sincerely,

HOBERT fA. GALLO

Robert M. Gallo, Chief

Operations Branch,

Division of Reactor Safety

Enclosure: NRC Region I Inspection Report No. 50-029/89-05

po (

e905100217 $830$29

'

I

PDR

ADOCK

ppy

0

- _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ -

7--_-

. _ _ _

-

I

I

'

'.

l

'

.

l

Yankee Atomic Electric Company

-2-

!

.

cc w/ encl:

)

Dr. Andrew C. Kadak, President & Chief Operating Officer

N. St. Laurent, Plant Superintendent

3

G. Papanic, Jr., Senior Project Engineer - Licensing

l

P. Agnes, Assistant Secretary of Public Safety, Commonwealth of

Massachusetts

C. Sterzinger, Commissioner, Vermont Department of Public Service

Public Document Room (PDR)

,

1

Local Pub'ic Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts.(2)

i

State cf Vermont

bec w/ encl:

Region I Docket Room (with concurrences)

M. Perkins, Management Assistant, DRMA (w/o enc 1)

D. Haverkamp, Section Chief, DRP

H. Eichenholz, SRI - Yankee (w/ concurrences)

G. Grant, SRI

Vermont Yankee

R. Bores, Technical Assistant, DRSS

M. Fairtile, PM, NRR

K. Abraham, PAQ ( w) PALF' Keports D @

J. Wiggins, DRP

RI:DRS

RI:

fdI'

/)b Dev/kl

B1

ri

1

4/2i /89

4/

89

/89

0FFICIAL RECORD COPY

IR YANKEE 89-05 - 0002.0.0

04/21/89

- _ - _ _ _ - _ _ _ _ _ _

__.