__. _ _,

OPERATING DATA REFCRT DOCKET NO 50-369 DATE March 15, 1989 0FE m i46 STATUS COMPLETED BY R.A. Williams TELEPHONE 704-373-5987

'1. Unit Nane: Mc6cire 1

2. Reporting Feriod: February 1, 1989-Febreary 23, 1989
3. Licensed Thermal Fower (Nt):

3411

4. Naseplate Rating (Gross MWe):

1305a Notes aNameplate Rating

5. Design Electrical Rating (Net MWe):

1180 (Gross MWe) calculated as

6. Marizue Dependable Capacity (Gross MWe):

1171 1450.000 MVA x.90 power

7. Marisua Dependable Capacity (Net MWe):

1129 factor per Fage 111,

8. If Changes 0ccur in Capacity Ratings (1 tees Number 3 Through 7) Since Last HURES-0020.

Report. Give Reastns

9. Fower Level To Which Restricted, If Any (Net MWe):
10. Reason fer Restrictions, If any:

This Month Yr.-to-Date Cumulative

11. Heurs In Reporting Feriod 672.0 1416.0 63528.0
12. Number Of Hours Reactor Was Critical 672.0 1416.0 45063.6
13. Feattor Reserve Shutdown Hours

--0--

--0--

--0--

14. Hours Senerator On-Lir.e 672.0 1413.4 44523.2
15. Unit Reserve Shutdcwn Hotts

--0--

--0--

--0--

16. Bress Thermal Energy Senerated (MWH) 2286701 4531960 1321554E5
17. Grcss Electrical Energy Generated (MWH) 501492 1582136 45691073
18. Net Electrical Energy Benerated (MWP) 773495 1523251 43576859
19. Unit Service Factor 100.0 99.9 70.1
20. Unit Availattlity Factor 100.0 99.8 70.1
21. Unit Capacity Factor (Using MDC Net) 102.0 95.3 59.0
22. Urtit Capacity Factor (Using DER Net) 97.6 91.2 58.1
23. Unit Forced Outage Fate 0.0 0.0 11.0 E4. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None l

l 25, if Shut Dcwn At End Of Report Period. Estisated Date of Startup:

26. Units In Test Status (Frior to Ccasercial Operation):

Forecast Achieved l

INITIAL CRITICALITY INITIAL ELECTRICITY CGMMERCIAL GPEFATION 8903220141 890$$

c)r i.

PDR ADOCK 05000o69 PDC R

--= -

-, q if OPERATINS DATA REPORT 4

DOCKET WO 50-369 UNIT =

McGuire 1 DATEMarch 15, 1989 -

l COMPLETED BY R.A, Willians-

' TELEPHONE 704-373-5987 1

'i i

HONTH February,1989 l

i

.1

. Pfl '

AVERAGE DAILY P0WER LEVEL DAY-AVERASE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) j 1

1158 17 1147 2

1157

!B '

1129 3

1158 19 1138 4

1156 20 1154 1

5 1155-21 1154 6

-1155 22 1153 7

1157 23 1153 8

' 1152 -

24 1154 9

1153 25 1155 10 -

1154 26 1155 11 1152 27 1155 12 1107 28 1153-13 1152 14 1154 0

15 1155 l-

=16 1151 L

l l

-t.

- R5

.)

I C

- atr 96 I1J4 T

N reo 3 U/

0 C

E GaepR 7

E R

phe

- G3 pC0J(

ROR teSRN S

M RTU ir O

C b P yt

.EEYE CNE i

r OMTBN OR hrtel NAA O

DI xonvi EfEEF NDDH NTT

)

T EP ACN 4

ET TE AE

(

KI EL E

V CN LE S

E OU PT U

R D -

M A

P O

C C

~

m arc S

S lla aam N

O T

duuoe I

N onnth E

haaut T

)

C 9

5 NE tMMA O D e-U 8

(

M1234 D

9 P O

)

E 1

M C 3

R O

(

y C

R r

S E

a E

N SM D

O W

u

)

O r

4 YE O

I ST C

T P

b

(

e C

D F

U N

D A

E E

S T

R S

NTR T

N ENO W

H CEP O

N

)

O T

IVE N

A n

D N

LER C

i T

O I

a U

M F

l H

TN I

p TD UW X N

x S

T

)

R 3EO FHO

/

G E

t MH OSD R

I T

O

(

(

I P

S s

ee N

E

)

U R

2 R

rt RE ASO N

O u

(

l r S

i o N

N a

O W

Fe IS O

c TR D

tngr AU T

nan RO U

eni UH h

mel ptel D

S ninuu ouif g O

s q a

)

1 TYPE N

aEMR e-(

RABC

)

2

(

E d

T e

A l

D du ed ce rh i

oc FS NO FS

)

t

1 L-DOCKET NO:

50-369 UNIT:

McGuire 1 DATE:

03/15/89 NARRATIVE

SUMMARY

Month: February, 1989 McGuire Unit 1 operated at or near 100% full power, without any significant reductions, for the entire month of February.

l Prepared by:

J. J. Mead Telephone: 704-373-5762

r MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: McGuire, Unit 1 2.

Scheduled next refueling shutdown: January, 1990 3.

Scheduled restart following refueling: March, 1990 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding'unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool:

369 8.

Present licensed fuel pool capacity:

1463 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 DUKE POWER COMPANY DATE:

March 15, 1989 Name of

Contact:

J. A. Reavis Phone:

704-373-7567 l

I

\\

OPERATING DATA REFORT DOCKET NO 50-370 DATE March 15. 1969 DPEM TING STATUS COMPLETED BY F.A. Williams TELEPHONE 704-373-5987

1. Unit Name McGuire 2
2. Reporting Period: February 1, 1989-February 28,1989
3. Licensed Thermal Power (M't):

3411 W

4. Nae,eplate Rating (Gross MWe):

1305*

Notes INaseplate Rating

5. Design Electrical Rating (Net MWe):

1145 (Gross MWe) calculated as

6. Maximus Dependable Capacity (Bross MWe):

!!92 1450.000 MVA x.90 power

7. Marleus Dependable Capacity (Net MWe):

~1129 factor per Page iii, B. If Changes Occur in Capacity Ratings (Itees Number 3 Through 7) Since Last NUREG-0020.

Feport. Give Reasons:

9. Fower Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, if any:

This Month Yr.-to-Date Cumulative

11. Hours in Reperting Feriod 672.0 1416.0 438E4.0
12. N;eber Of Hours Reactor Was Critical 672.0 1416.0 33175.4
13. Reactor Reserve Shutdown Hours

--0--

--0--

--0--

14. Hours Generatcr On-Line 672.0 1416.0 32474.B
15. Unit Reserve Shutdown Hours

- --0--

--0--

16. Bress Therral Energy Generated (MWH) 2280475 4755555 10606S659-
17. Gross Electrical Energy Generated (MWH) 803283 1672937 37126687
19. Net Electrical Energy Generated (MWH) 775858 1613578 35603693
19. Unit Service Factor 100.0 100.0 74.1
20. Unit Availability Factor 100.0 100.0 74.1
21. Unit Capacit, Factor (Using MDC Net) 102.3 100.9 70.3
22. Unit Capacity Factor (Using DER Net) 100.E 98.0 68.9
23. Unit Forced Dutage Rate 0.0 0.0 11.6
24. Ehutdcan Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling - July 5,1989 - 10 weeks

25. If Shut Dow1 At End Of Report Period. Estimated Date of Startup:
26. Uaits In Test Status (Frict te Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL 0FERATID4

[g.

,4 :.1. ;

~

~

- - ~

- ~ - -- -

c; h,"a.

. :q p-h I...

OPERATING DATA REPORT l

L l;.

DDCKET'ND 50-370 l! NIT McGuire 2 _.

DATE March 15. 1989 COMPLETED BY R.A. Williess TELEPHDNE 704-373-5907-w.

t <.

MDNTH February 1969 D,1

'AVERABE DAILY POWER LEVEL

DJJY, AVERAGE DAILY POWER LEVEL J

(MWe-Net)

(MWe-Net) 1 1158 17 1159 2

!!59 18 1158 3:

-1159 19 1159

,4 1160 20 1159

.5 1160 21 1160 6

1158 22 1063 7

1159 23 1160 8

1159~

24 1159

'9 1159 25 1160 10 1155 26 1161 11 '

1129 27 1160 12 1159 28 1162 13 1158 14 1159

. 15 1159 15 -

1159 l

i 1

J

R5

.)

I C

- atr 0I1 J4 T

N reo 7U/

0 C

E GaepR 3 G3

. 7 E

R ph e 0 C0J(

ROR teSRN 5M-RTU ir O

C bPyt -

.EEYE CNE i' rn OMTBN I R hrtel NAA O

D I' xonvi L

- NDDH NTT EfEEF

)

T EP ACN 4 -

ET TE AE

(

KI EL E'

V f

CN LE S

E OU PT U

R D.

M.

A P

O C

C m

arc S

S lla N

aam O

T-duuoe T

N onnth I

E -

haaut

)

C 9

5 NE tMMA O D e-U 8

(

M1234 D

9 P O

)

E 1

M C 3

R O '

(

y C

R r

S E

a

- - E N

SM D O

W u

)

O r

4 YE O I

ST C T

P b

(

e C

D F

U N

D A

E E

S T

R S

NTR T

N ENO W

H CEP O N

)

O T

IVE N A

n D

N LER C

i T

O I

a U

M F

l H

TN I

p S

T TD UW X N

x

)

R 3EO FHO /

G E-t MH OSD R I

(

T O

(

I P

S

- s ee N

E

)

U R

2 R

rt RE ASO N O

u

(

lr S

i o N

N a.

O W

Fe IS O

c TR D

tngr AU T

nan RO U

eni UH H

mel ptel D

S ninuu o uif O

s q a

)

1 TYPE N

aEMR e-(

RABC

)

2'

(

E d

T e

A l

D du ed ce rh oc FS NO FS

)

1

(

DOCKET NO:

50-370 UNIT:

McGuire 2 DATE:

03/15/89 NARRATIVE

SUMMARY

Month:

February, 1989 McGuire Unit 2 operated at or near 100% full power, without any significant reductions, for.the entire month of February.

I j

)

l l

Prepared by:

J. J. Mead i

Telephone: 704-373-5762 l

  • ~

4 MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: McGuire, Unit 2 2.

Scheduled next refueling shutdown: July, 1989 3.

Scheduled restart following refueling:

September, 1989 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool:

518 8.

Present licensed fuel pool capacity:

1463 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 l

DUKE POWER COMPANY DATE:

March 15, 1989 l

Name of

Contact:

J. A. Reavis Phone:

704-373-7567

. _-