V cp.. 2 r Vaney Power Station Shippingport. PA 15077@04 4 0 Nuclear Gmp W21 M55 May 9, 1989 U.
S.
Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555 1
Reference:
Beaver Valley Power Station, Unit No. 1 I
Docket No. 50-334, License No. DPR-66 Proposed Operating License Change Request No. 162 p
l Gentlemen:
Enclosed are:
1.
Application for Amendment to the above operating license to support Cycle 8
operation by incorporating an increased rod drop
- time, increased peaking factors and changing the DNB design basis to the WRB-1 correlation.
This. change was reviewed by the OSC and ORC and determined to be safe and does not involve an unreviewed safety question.
1 2.
Supporting document entitled
" Plant Safety Evaluation for
' Beaver Valley Power Station Unit 1 Fuel Upgrade and Increased Peaking Factors".
Appendix B includes an information copy of recommended UFSAR changes.
l 3.
Documents designated Attachments A,
B and C which set forth the change to the Technical Specifications, the safety analysis and the no significant hazards evaluation.
Very truly yours, l
I M
D. Sieber Vice President Nuclear Group l
cc:
Mr. J.
Beall, Sr. Resident Inspector Mr..W. T. Russell, NRC Region I Administrator Mr.
P. Tam, Sr. Project Manager Mr. T. M. Gerusky, Director BRP/ DER Mr.
R. Janati, BRP/ DER Director, Safety Evaluation & Control (VEPCO) 4NCd 8905180050 890509 g0 PDR ADOCK 05000334 P
PDC geclo s
o
)