Responds to Unresolved Item 88-12-11 Noted in Insp Repts 50-327/88-12 & 50-328/88-12.Corrective Actions:Insp Performed by Gilbert/Commonwealth,Inc of Five of Eight Exhaust Lines Revealed No Damage to Piping & Welds
ML20246J547
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/10/1989
From: Michael Ray
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8905170108
Download: ML20246J547 (3)


Text

. - _ _ _.,. -. -

~e TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 EN 157B Lookout Place MAY 101989 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C.

20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) UNITS 1 AND 2 - NRC INSPECTION REPORT NOS.

50-327/88-12 AND 50-328/88 RESPONSE TO UNRESOLVED ITEM (URI) 88-12-11 During NRC's inspection in Knoxville, Tennessee, during the week of February 15, 1988, a number of miscellaneous issues were reviewed as follow-up from previous NRC inspection itenis.

The subject item, entitled " Diesel Generator Exhaust Piping," resulted from NRC's review of deficiency D4.3-7 from Integrated Design Inspection 50-327, 328/87-48.

In a March 3, 1988, telephone conference call between NRC and TVA, it was agreed that TVA's follow-up action for closure of this item would be to inspect the affected diesel generator exhaust piping support attachments for damage. This issue was further identified as URI 88-12-11 in S. D. Richardson's June 24, 1988, letter to S. A. White.

The enclosure provides the results of the diesel generator exhaust piping-support attachment inspection and TVA's response to URI 88-12-11.

If you have any questions, please telephone B. S. Schofield at (615) 843-6172.

Very truly yours, TENNESSEE VALLEY AUTHORITY

'Y W

i

,a Manag' r, Nuclea Lic nsing and Regulatory Affairs Enclosure cc:

See page 2 8905170100 890510

I

.PDR c.ADOCK 05000327 Q

PDC An Equal opportunity Employer

d j~,

I U.S. Nuclear Regulatory Commission hA/0( 101989 cc (Enclosure):

Ms. S. C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. B. A. Wilson, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 l

_._-_______-_-.___-____m

ENCLOSURE URI 88-12-11, " Diesel Generator Exhaust Piping" "The staff review of TVA's evaluation of piping in the diesel generator building for the effects of the time step on the seismic response spectra identified that TVA had used interim criteria that had not been reviewed and approved by the staff.

The staff considered the use of this criteria i

acceptable providing TVA visually inspect the affected support attachments on I

the diesel generator exhaust lines to determine if any damage had occurred.

TVA should provide the results of this inspection to the NRC."

Response

In response to NRC's request that TVA visually inspect the affected support attachments on the diesel generator exhaust piping, a field inspection was performed by Gilbert / Commonwealth, Incorporated.

Five of the eight exhaust lines were inspected.

The results showed that the lugs inspected had gaps t

ranging from 0.5 inch to 1.25 inches and that the piping and welds showed no i

damage because of the potential lug contact (e.g., dents, dimples, or other visual damage).

The remaining three exhaust lines were not inspected because inspections of these lines would have required the removal of insulation.

Because all eight of the exhaust lines have a similar configuration and lug location, the five lines inspected are representative of all the exhaust lines.

Because of the above information, the condition that originally raised the I

concern over the analysis package is acceptable; and TVA has concluded that the analysis is representative of the existing as built configuration and is adequate. TVA, therefore, proposes to close this unresolved item.

l

)