Forwards Rev 0 to Special Procedure SPP-89-9, Control Room Boundary In-Leakage Test. Requests That Next in-leakage Test Be Deferred Until Unit 1 Refuel Outage Currently Scheduled to Start on 890904
ML20246H611
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/28/1989
From: Hunsader S
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20246H616 List:
References
0090T:3-4, 90T:3-4, NUDOCS 8909010311
Download: ML20246H611 (2)


Text

- - - - - - - - - - - --- -

= - - - - - - - - - - - - - - - - - -

y 7 g ,

[. _v w /YCommonwealth' Edison H*9 72 West Adams Street. Chicago, Illinoili

, Address R ply to: Post Offee Box 76E

' Q^ N Chicago, Illinois 60690 0767 o August 28, 1989 Dr.. Thomas.E. Murley,' Director

-Office of Nuclear Reactor Regulation U.S. Nuclear, Regulatory' Commission Hashington, DC .20555 Attn: Document Control Desk j

Subject:

Braidwood Station Units 1 and'2 Control Room Inleakage Test NRC Docket'Nos. 50-456 and 50-457

Reference:

(a) April 2, 1987 S.C. Hunsader letter to H.R. Denton

.(b) May 30, 1989 S.C. Hunsader letter i to T.E. Murley (c) July 19, 1989 S.C. Hunsader letter to T.E. Murley (d) July 21, 1989 S.P. Sands letter to T-.J. Kovach  :

i

Dear Dr. Murley:

Reference (a) provided Commonwealth Edison's (Edison) committment to perform a test to determine air infiltration into the control room envelope when the control room is placed in the isolation mode. The first test was performed in January, 1988. The next test was required to be performed, in July, 1989.

1 Reference (b) provided Edison's evaluation which shows that-alternative  !

measures exist to demonstrate control room integrity other than performing an "In I leakage" test. This submittal is currently under NRC staff review.

Since the NRC review is ongoing, reference (c) requested that the next "in leakage" test be deferred, so that it could be performed during the Braidwood Unit i refuel outage, currently scheduled to start on September 4, 1989. j Reference (d) provide the NRC Staff acceptance of this deferral request. -

p Performing the test during the Unit 1 outage will allow it to be performed with Unit 1 in Modes 5 or 6 and reduce the impact of performing the test with two Units  ;

in Mode 1. This will give the station greater flexibility to successfully perform  !

the ter,t.

OY l 8909010311 890828 ig PDR ADDCK 05000456 I f_ PNV c, t_i _____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

r yx l ,

Dr.iT.E. Murley - 2' '. August' 28, 1989' p

The purpose of-this letter is to provide the NRC Staff a draft copy of-

- Braidwood Station procedure SPP-89-9, " Control Room Boundry'Inleakage Test"'that

' prescribes'the methodology that will be utilized.- The test-is scheduled to be

- performed in September, 1989, during the Unit 1 outage.

- -This is being submitted for NRC review and information in conjunction with the, review of reference (b). Please address any questions concerning this submittal to-this office.

'Very truly yours,-

)0 Y=

S.C. Hunsader

' : L Nuclear Licensing Administrator

/sc1:0090T:324 cc: S.' Sands-NRR J. Hinds-RIII Resident Inspector-Braidwood