ML20246H481

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1989 for Wolf Creek Generating Station
ML20246H481
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/28/1989
From: Wiiliams M
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20246H485 List:
References
NUDOCS 8903200226
Download: ML20246H481 (6)


Text

r _._-

4'.."

' Attachment to WM 89-0079 s

s WOLF CREEK NUCLEAR OPERATING CORPORATION WOLL CREEK GENERATING STATION MONTHLY OPERATING REPORT MONTH:

' February YEAR:

1989 Docket No.:

50-482 Facility Operating License No.: NPF-42 Report No.

48 Prepared by:

f Merlin G. Williams l

1 8903200226 89031S f

e PDR ADOCK 05000482 FDC R

k

\\

_a

-l Attachment to WM 89-0079 c,

SUMMARY

The following report highlights the operating experience of Wolf Creek Generating Station for the month of February, 1989. This report is being provided pursuant to Technical Specification 6.9.1.8.

I.

SUMMARY

OF OPERATING EXPERIENCE Unit operated at 100 percent power until 1324 hours0.0153 days <br />0.368 hours <br />0.00219 weeks <br />5.03782e-4 months <br />, February 02, 1989, when a reactor trip occurred due to a Main Steam Generator Isolation Valve closure resulting in Steam Generator Lo-Lo level from an accidental bumping of a protection circuitry cabinet containing a loose terminal board screw.

Unit entered Mode 2 - Startup at 2252 hours0.0261 days <br />0.626 hours <br />0.00372 weeks <br />8.56886e-4 months <br />, February 03, 1989, and Mode 1 - Power Operation at 0544 hours0.0063 days <br />0.151 hours <br />8.994709e-4 weeks <br />2.06992e-4 months <br />, February 04, 1989. Unit was at 100 percent power at 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br />, February 05, 1989.

At 1753 hours0.0203 days <br />0.487 hours <br />0.0029 weeks <br />6.670165e-4 months <br />, February 03, 1989, maximum electrical generation was reduced 25 megawatts due to Heater Drain Pump "B" being declared inoperable from a defective mechanical seal. On February 10, 1989 at 0535 hours0.00619 days <br />0.149 hours <br />8.845899e-4 weeks <br />2.035675e-4 months <br />, the Heater Drain Pump was returned to service.

Unit remained at 100 percent power through the remainder of the month.

II.

MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES 1.

Checked electrical scheme terminations on control circuitry cabinets of the Neutron Monitoring System (SE), Reactor Protection System (SB), Engineered Safeguards Features Actuation System (SA),

Load Shedding and Emergency Load Sequence (NF), and Miscellaneous Control Panels (RP).

l l

Wolf Creek Generating Station Monthly Operating Report February 1989 Page 1 of 5 i

Attachment to WM 89-0079 a

OPERATING DATA REPORT l

DOCKET NO.

50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 03-01-89 COMPLETED BY M. Williams TELEPHONE 316-364-8831 OPERATING STATUS 1.

Reporting Period:

February, 1989 Gross Hours in Reporting Period:

672 2.

Currently Authorized Power Level (tMt): 3411 Max. Depend. Capacity (tMe-Net): 1135 l

i l

Design Electrical Rating (tMe-Net):

1170 l

3.

Power Level to Which Restricted (If Any) (Mwe-Net):

N/A 4.

Reasons for restriction (If Any):

N/A This Month Yr to Date Cumulative 5.

Number of Hours Reactor was Critical 637.4 1,371.3 22,955.4 6.

Reactor Reserve Shutdown Hours

0. 0 0.0 339.8 7.

Hours Generator on Line 629,9 1,276.4 22,443.9 8.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.

Gross Thermal Energy Generated (TMH) 2,113,705 4,208,791 73,780,908 1

i

10. Gross Electrical Energy Generated (TMH) 740,328 1,475,332 25,644,537 l

l 11 Net Electrical Energy Generated (TMH) 710,484 1,413,449 24,433,892

12. Reactor Service Factor 94.9 96.8 75.0
13. Reactor Availability Factor 94.9 96.8 76.1
14. Unit Service Factor 93.7 90.1 73.3 1
15. Unit Availability Factor 93.7 90.1 73.3 I
16. Unit Capacity Factor (Using MDC) 93.2 87.9 70.8

{

17. Unit Capacity Factor (Using Design PMe) 90.4 85.3 68.2
18. Unit Forced Outage Rate 6.3 3.9 6.0
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): None.

20.

If Shut Down at End of Report Period, Estimated Date of Startup:

N/A Wolf Creek Generating Station Monthly Operating Report February 1989 Page 2 of 5 o ---

u

Attachment to WM 89-0079

~

AVERAGE DAILY UNIT POWER LEVEL

. DOCKET NO.

50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING' CORPORATION DATE 03-01-89 COMPLETED BY M. Williams TELEPHONE 316-364-8831 MONTI!

February, 1989

. DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-(!Me-Net).

(MNe-Net) 1 1154 17 1154 2

622 18 1154 3

0 19 1155 4'

275 20 1153 5-1123 21 1154

.6-1151 22 1153 7

1153 23 1152 8

1146 24 1153 9

1126 25 1153 10 1146 26 1153 11 1148 27 1153 12 1153 28 1153

-13 1152 29 N/A 14 1152 30 N/A 15 1153 31 N/A 16 1154 Wolf Creek Generating Station Monthly Operating Report February 1989 Page 3 of 5

U EEI A N

n

.l 5

MMAO KNTDDO ipo 0

CEA' EH ti r OGR TP l rt y

D E

EE uTn r

1234 KP LL S

s o

a k

EO PE T

er c u

E M T.

N ro r

RR O

E t e b

D CA C

M ech e

O E

P rat F

H FL O

ue T

LC C

sR n n

E OU

/

o i

WN S

l g.

O M

N cnw K

O ie

)

E I

"C u c sr d

2 E

T e

(

R C

" as r

C A

c r.

e l

uh F

E vl a ct N

L V

l en cn O

O I

avi oo I

W T

Vem m

T C

l r p

A E

n e

ie N

R oot rh I

R iL Tt M

O t - e A

C ans rf X

lI o oo E

S o

o t

N s"

l cr E

O IC ae S

I a

ed N

T m"

)

Rn E

N C

ary.

i C

I U

eob na I

A D

tt t

em L

L E

Sade he P

R

- r en wr D

X n e si N

E R

inub

,e A

(

E aeaa 9h W

MG cc 8 t G

R O

9 N

O P

1h I

R)

)

2 g

NERN D

(

,u I VEI N

GRR 2 o AI A

A NOE 0 r RTLL I I W h

TAAP N

TCO yt RNX W

TAP r

RTOE O

UE at OSI(

D HRG ua I I T T

S N

3 rh A' NAR U

EI bt RI RE H

SHC e

EMEH S

DTU Fr PDPT O

D a

OAOO T

HNE l e I

I WR i n N

E' O t

U MDR nd EFGH O

ue n

ri N

ea

)

O wm N

S) oe I

A1 A

pr A

E(

L R

td P

N nr X

O ea E

I N) c T

P

(

OS rr S

C I R 1

ee EE I

TU pw RT R

9 AO 2

o U

T 7

RH 4

0 p LR S

0 9

U(

0 I O E

0 8

D 1t A

R 9

n FE 9

1 t e C

Y 8

D ac PNGR E

r MANO

~

M y

L d e ENI I W

r DU ep M E L A' a

EED t

PTEL o

u PCE a0 I NUU t

r YRH F

r0 UI FG b

TNS C

e1 QAEE t

e p

EMRR n

F ot e

a m

FS t

h i s ABCD c

H 9

na a

T 8

Uw t

N e

N t

O t

2 O

A M

a 0

S D

Y A

T 2

R F

R 0

A R

O M

P o

1 E

N W

)

R S

1

(

l

p J

/. Attachment to WM 89-0079 j

WOLF CREEK NUCLEAR OPERATING CORPORATION l

i WOLF CREEK GENERATING STATION i

UNIT NO. 1 l

MONTH February, 1989 i

j

SUMMARY

OF OPERATING EXPERIENCE a

l Listed below in chronological sequence is a sumary of operating experiences for this month which required load reduction or resulted in significant non-load related incidents.

DATE TIME EVENT February 02, 1989 1324 hours0.0153 days <br />0.368 hours <br />0.00219 weeks <br />5.03782e-4 months <br /> Reactor Trip - Main Steam Isolation Valve "C" closure resulting in Steam Generator "C Lo-Lo level caused by a loose terminal screw in control I

cabinet.

February 03, 1989 2252 hours0.0261 days <br />0.626 hours <br />0.00372 weeks <br />8.56886e-4 months <br /> Entered Mode 2 - Startup.

2359 hours0.0273 days <br />0.655 hours <br />0.0039 weeks <br />8.975995e-4 months <br /> Reactor Critical.

I February 04, 1989 0544 hours0.0063 days <br />0.151 hours <br />8.994709e-4 weeks <br />2.06992e-4 months <br /> Entered Mode 1 - Power Operation.

0730 hours0.00845 days <br />0.203 hours <br />0.00121 weeks <br />2.77765e-4 months <br /> Synchronized to grid.

l February 05, 1989 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> Reactor at 100% Power.

4 l

r Wolf Creek Generating Station Monthly Operating Report i

February 1989 Page 5 of 5

_ ________ _ _ _ _ ______ ____________________ _ ____ _