ML20246F785

From kanterella
Jump to navigation Jump to search
Amends 95 & 71 to Licenses DPR-70 & DPR-75,respectively, Deleting Requirements for RHR Sys Autoclosure Interlock
ML20246F785
Person / Time
Site: Salem  
Issue date: 05/02/1989
From: Butler W
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20246F788 List:
References
NUDOCS 8905150098
Download: ML20246F785 (10)


Text

__

A g

\\

[

UNITED STATES g

NUCLEAR REGULATORY COMMISSION E

WASHINGTON, D. C. 20555 f

%,..... p PUBLIC SERVICE ELECTRIC & GAS COMPANY PHILADELPHIA ELECTRIC COMPANY 1

DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-272 SALEM GENERATING STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 95 License No. OPR-70 1.

The Nuclear Regulatory Comission (the Comission or the NRC) has found that:

A.

The application for amendment filed by the Public Service Electric &

Gas Company, Philadelphia Electric Company,(Delmarva Power and Light Company and Atlantic City Electric Company the licensees) dated December 20, 1988 and supplemented on March 3, 1989 complies with the standards and requirements of the Atomic Energy Act of 1954, as i

amended (the Act), and the Comission's rules and regulations set I

forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance: (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-70 is hereby amended to read as follows:

8905150098 890502 PDR ADOCK 05000272 i

P l

PDC l

l3 p.

. (2) Technical S' specifications and Environmental Protection-Plan i--

The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 95, are hereby incorporated in-the license. The licensee shall operate the facility in accordance with.

the Technical Specifications.

3.

This license amendment is effective as of startup from the eighth refueling outage scheduled to end in May 1989.

FOR THE NUCLEAR REGULATORY. COMMISSION

/S/

Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II

Attachment:

Changes to the Technical Specifications Date of Issuance: May 2, 1989 l

l l

l M

)

M. ' A tpJStone:tr PDI-2/PM OGC PDI-2/D i M ( ien o

/>c4AA WRutler u

/g/89 4 /p /89

$/f_/89 U 89

i l 1

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendices A and B, as j

revised through Amendment No. 95, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical. Specifications.

i 3.

This license amendment is effective as of startup from the eighth refueling outage scheduled to end in May 1989.

l FOR THE NUCLEAR REGULATORY COMMISSION I

Lb Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II i

Attachment:

Changes to the Technical-Specifications Date of Issuance:

May 2, 1989 l

l

ATTACHMENT TO LICENSE AMENDMENT N0_. 95 FACILITY OPERATING LICENSE NO. OPR-70 DOCKET NO. 50-272 Revise Appendix A as follows:

Remove Page Insert Page 3/4 5-5b 3/4 5-5b i

e i i

l

~~

)

DERGENCY CORE COOLING SYSTEMS l

SURVEILLANCE REQUIRD ENTS (Continued) l 1.

The automatic interlock function of the RER System shall be verified within the seven (7) days prior to placing the RER System in service j

for cooling of the Reactor Coolant System. This shall be done by verifying with a test signal corresponding to a reactor coolant j

pressure of 580 psig or greater, that the IRH1 and 1RH2 valves cannot be opened.

d e

I 1

SALEM - (MIT 1 3/4 5-Sb Amendment No. 95

. 4l s

f[wSUG e

UNITED STATES p,

NUCLEAR REGULATORY COMMISSION f

5

.}

WASHINGTON, D. C. 20555

]

PUBLIC SERVICE ELECTRIC & GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-311 SALEM GENERATING STATION, UNIT NO. 2 L

AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 71 License No. DPR-75 1.

The Nuclear Regulatory Comission (the Comission or the NRC) has found that:

A.

The application for amendment filed by the Public Service Electric &

' Gas Company, Philadelphia Electric Company,(Delmarva Power and Ligh Company and Atlantic City Electric Company the licensees) dated December 20, 1988 and supplemented on March 3, 1989 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance: (1)thattheactivitiesauthorizedby this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

l 2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-75 is hereby amended to read as follows:

i 1

?:.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendices A and B, as 1-revised through Amendment No. 71, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

l.

3.

This license amendment is effective as of startup from the fifth refueling l

outage currently scheduled for March 1990.

FOR THE flUCLEAR REGULATORY COMMISSION L

/S/.

Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II

Attachment:

Changes to the Technical Specifications Date of Issuance: May 2, 1989 en 1M/PO.A PDI-2/PM gG PDI-2/D

.l p!4 bien JStone:tr H

utler

[ /

89

/p/89 4/ /89

/2/89 2

= _

H

. (2) Technical Specifications and Environmental Protection Plan l

The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 71, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the. Technical Specifications.

3.

This licenre amendment is effective as of startup from the fifth refueling outage currently scheduled for March 1990.

FOR THE NUCLEAR REGULATORY COMMISSION Nant W & tL Walter R. Butler', Director Project Directorate I-2 Division of Reactor Projects I/II Attachmer,t:

Changes to the Technical Specifications Date of Issuance: May 2, 1989 I

ATTACHMENT TO LICENSE AMENDMENT N0. 71 FACILITY OPERATING LICENSE N0. DPR-75 DOCKET NO. 50-311 Revise Appendix A as follows:

Remove Page Insert Page 3/4 5-6a 3/4 5-6a

(

IDEkCENCY CORE COOLING SYSTEMS l

SURVrittmCE REQUIREMENTS (Continued) 1.

The automatic interlock function of the RER System shall be verified within the seven (7) days prior to placing the RER System in service for cooling of the Reactor Coolant System. This shall be done by verifying with a test signal corresponding to e reactor coolant pressure of 580 psig or greater, that the 2RH1 and 2RH2 valves cannot be opened.

(

l

  • (Footnote from page 3/4 5-6)

Flow balance testing pursuant to specification 4.5.2.h shall be performed the first time the unit is in COLD SHUTDOWN after December 15, 1981.

SALEM - UNIT 2 3/4 5-6a Amendment No. 71 i