Text
N MED 70me poh C
February 15, 1989 MEMORANDUM'FOR:
Edward L. Jordan, Chairman Robert M. Bernero, NMSS Jack R. Goldberg, OGC Carl J. Paperiello, RIII Denwood F. Ross, RES James H. Sniezek, NRR THRU:
C. J. Heltemes, Jr., Deputy Director Office for Analysis and Evaluation of Operational Data FROM:
Cheryl A. Sakenas, Program Manager CRGR Staff Office for Analysis and Evaluation of Operational Data
SUBJECT:
ISSUE IDENTIFICATION FOR CRGR MEETING NO. 158-Enclosed for.your information is an issue sheet relating to CRGR's consideration of the draft SER for topical reports WCAP-10271, Supplement 2 and WCAP-10271, Supplement 2, Revision 1, " Evaluation of Surveillance Requirements and Out of Service Times for the Engineered Safety Features Actuation System." This item is scheduled to be discussed at Meeting No. 158 i-in Room 6507 MNBB.
If you have any questions, please call me at 492-4148.
l l
Ludadi Signed by:
Cheryl A. Sakenas, Program Manager CRGR Staff Office for Analysis and Evaluation of Operational Data
Enclosure:
As stated cc w/ enclosure:
V. Stello M. Wohl Distribution:
Central File J. Heltemes
/
CRGR SF
'C." Sakenaso O
Ny g'
Q.
<h fLO l
0FC
- AE0D:CRGR A OD-I..'.[S!........$$$I.!............!............!........................!...........
DATE $
2/P /89 2/ % 89 8907140020 890215 nn err e RETrn nnnU
@ [R"' n {M ~B E'D EFL)l' 5 PDR REVGP NRCCRGR is t
MEETING 158 PDC
i ISSUE SHEET FOR I
DRAFT SAFETY EVALUATION REPORT ON TOPICAL REPORT WCAP-10271, SUPPLEMENT 2 L
The staff has requested waiver of CRGR review of the subject topical reports on the basis that they do not present new methodology or require a new staff position.
In reviewing the draft SER, I found that the staff has changed l
their position regarding the testing strategy for RPS analog chanc.el testing (see Section 4.0, last paragraph).
The basis for this change in staff position is briefly described and does not really address the primary concerns j
identified by the staff when they required staggered testing.
Reference 1 of the draft SER discusses the staff's concern with common mode failures which is the primary basis cited for requiring staggered testing in a quarterly test program.
In particular, see the third paragraph on page 7 of the enclosed SER.
This item was scheduled for CRGR review at Meeting No. 73, but due to rescheduling the meeting, CRGR review was waived.
(A copy of the CRGR review package is enclosed.) Based on this lack of clarity in the draft l
SER, the staff has been asked to describe their basis for the proposed change.
l l