ML20246F692

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Changing Sections on Effluent Releases, Max Flood,Water Accumulation,Records & Insps
ML20246F692
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 08/23/1989
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20246F371 List:
References
NUDOCS 8908310108
Download: ML20246F692 (8)


Text

hd ??

}s; app ndix;A274 WCB i ( y.,

~ ~

, ! p i

  • )

i+/

,f zAPP'ENDIX$A 65

(;. "

.to.

License No..DPR-12

~

. TECHNICAL SPECIFICATIONS 7..

',.l-for

'l

. Peach 1 Bottom AtomicTPower-Station.

yg Unit.No. 1

.y

/

71.0 LOCATION AND SITE o

The Peach, Bottom Atomic Power Stat' ion (PBAPS)' Unit No. 1 is locatedLin Peach Bottom Township, Pennsylvania,.in the western

<:shorerof;the Conowingo Pond at"the mouth of Rock Run Creek on a

.i site' owned by PhiladelphiafElectric Company..These Technical-H 4

Specifications apply-to the PBAPS Unit No. 1 Exclusion Area.- The

-I

' Exclusion Area sha31 consist of an area within the PBAPS which is-enclose'd within locked' barriers, and contains.the Cont'ainment 4

i

. Vessel, Spent; Fuel' Pool Building and Radwaste Building.

The only activity carried on,within the' Exclusion Area shall be routine I

1 and 'eniergency l inspections and maintenance associated with the

. possession of the decommissioned PBAPS. Unit No. 1.

Peach Bottom i

i Atomic Power Station, Units 2 and 3 are also located on the site.

l l

r j

l 1

. 2. 0 ' ADMINISTRATIVE AND PROCEDURAL SAFEGUARDS

/

1 l

'2.1 Administrative Organizations and Controls l

(a)

Plant Manager I

4 s900310108 890B23 l

PDR ADOCK 050001 1 P

f l

App:ndix A Page 2 1

The. Peach Bottom Plant Manager shall have the responsibility for administration of all Unit No. 1 functions.

(b)

Controls f

l.

Except when opened to provide egress for inspections, surveys and repairs, the following exclusion area barriers shall be maintained locked:

i.

The gate in the Exclusion Area fence located outside the containment personnel access lock at Elevation 116'-0".

ii.

The gate in the Exclusion Area fence.

located outside the Spent Fuel Pool Area personnel access door at Elevation 116'-0".

I iii.

The gate in the Exclusion Area fence I

located outside the containment 3

personnel access lock on Elevation 176'-6".

l iv.

Containment personnel access lock at Elevation 116'-0".

l L

App:ndiX'A Page 3 o

I v.

Containment personnel access lock at Elevation 176'-6".

vi.

Grating over southwest stairway leading from refueling floor of Containment to Containment lower levels vii.

Perronnel door into Spent Puel Pool Area at Elevation 116'-0" viii. Radwaste Room personnel ~ door at Elevation 104'-0"

)

2.

Employees of the Peach Bottom Atomic Power Station shall report to the Peach Bottom Plant Manager or his designated representative any observed indication of change in facility status as shown by smoke, fire, tornado, flood or attempted break-in and take any immediate action i

l authorized.

3.

Administrative procedures shall be established for the notification and reporting of the following reportable

)

)

events:

i 1

h@g'o%? [I g

f 03ndix A' Page 4' I p$ [g*,(y.

gs X

,j J

V' s

j;

{ < 4/

i. _

-Thel entrance of:.an' unauthorized

[

. person (s) into.the facility.

O

-ii.,

.A significantl change ih.the1

.e

+'J radiation'or.contami' nation levels'in

,e, the facility.

rh 1

/4

.iii.

Effluent' releases'in excess of~

(

Specification 2.l(b)(8).

i; -

.iv.

Water:' accumulation in the containment' sump in excess of-s

Specification 2.1(b)(9).-

4..

Security of the facility shall be included-as a part of the Peach Bottom Atomic., Power.

Station security plan.

5.

In the.. event of a Probable Maximum Flood, the personnel, access' door at' elevation 116'-0" shall be-opened in accordance with the Peach Bottom Atomic Power Station

. Units 2 and 3 flood procedures.

6.

If entry and/or work in the controlled i

area of the containment should he j

necessary, radiation level and airborne activity-surveys shall be performed prior to beginning work and all work shall be r

J

.j 1

__---_-------_-------------.-------------------------------------N

4 y-

. 3+ l m

& ly' L..cy fo[ _

it.1 Jhppandix"Al Page 5 g M j-f

.. e.

~#1 performed under controls;;as appropriate,

. to minimize L the'. radiatior, exposure _ of l personnel.and to prevent the~ release of

+'

'radioacti9ity'td the' environment'.

7.

-All radiation surveys, tests, counting' work and. radiation erposure control measures shall.be performed in act:ordance

.}

with written instructions,and procedures that conform with.the~ requirements of the Peach. Bottom Atomic Power Station Units 2-and 3 radiation control procedures.

8.

5ffluent-Release Limits i.

Liquid Effluents-Radioactive waste discharges to.

offsite locations shall not exceed the. limits given in 10'CFR 20, Appendix B, Table II, Column 2, on an instantaneous basis.

ii.

Gaseous Effluents Gaseous effluents shall not result l:

1.

l in offsite ground level concentrations exceeding the limits given in 10 CFR 20, Appendix B, l

1' 1.

-.----------------__------_-------,-------,--,-___-___m

a

> 94' >&

7 :dL ;;,[, ~-Appandi'x-JI Pags 6.-

LL (TiO (

90; m

3 Table _ II, coluran.1v onlan/

n instantaneous'sJbasis.

9.-

Waterfintrusion Limits' Water; accumulation'in the: containment sump shalli

~ b'e: limited to-500 gallons.

2.2-

. Records' b

Licensee'shall keep logs and records i'n sufficient' scope:and detail to establish that the fac'ility;is being maintained'within the limitations of the Part~50' Possession Only License.

The following: items shall be recorded:

(a)

Results of periodic inspections (b)

Records required by 10 CFR 50.75(g).

(c)

Reportable events

'2.3 Periodic Inspections The following inspections of the Unit No. 1 facility shall be performed by personnel knowledgeable in nuclear radiation monitoring and with the radiological hazards associated with the decommissioned plant.

Records of these 1

inspections shall be maintained on file.

..p.

._mu

__-____.-au____-~_

._-_s-ms

-_-__.__.________~u_,4.2__._____.a--_..__-___m_m_

-t_a

__m2__m__-..

__m m

.'M

Ec$

....* h. '.

_i:

u? [

rec;Mpprndix A Page.7 g

l_ < ' (.,

ri-e

.(a);

Monthly ~' Inspections t ';

Inspect 1the accessible. areas below'gr'ound level in the-containment vessel for water

E accuidulation. ' Perform a' radiological' analysis i

if there is sufficient water accumulation to L

obtain a sample, (b)

Semi-Annual Inspection 1.

Co11 duct an inspection of exclusion area barriers to ensure that the integrity of the barrier, and their. locking apparatus are intact.

~

2.

Conduct a radiological survey of:the n

. accessible.aleas of the exclusion area.

The' survey shall include radiation levels and surface contamination as well as air particulate activity.

I 1

3.

The high efficiency particulate filter on the containment breather line shall be i

surveyed for activity, and the filter changed at least annually.

I.

2.4 Reports

]

l l

i

___________-________________a

(- -- -

t R

abJ _.

L (p App 3ndixiAR Page 8 j l (b (a)l' An annual. report shall be submitted to the

~

Nuclear Regulatory Commission, Washington, DC 20555,7 describing the results of: facility Eradiation su~rveys,'the. status'of the facilityt; and an evaluation of the performance of security and surveillance measures.

Include the-results I

of the radiological analysis,.alonglwith an L

i evaluatioth of the source of the' water'and corrective' actions taken,.for sampleable quantities of water accumulation in the-1[

Containment vessel.

. (b).

The NRC Regional Office shall be notified within L24 hours of discovery of a reportable. event (specification 2.1(b)(3)), and a1 written report L

pursuant to 10 CFR 50.73 shall be suomitted to the Admin'istrator of the Rcgional' Office within 30 days.

i i

c l

l

_______________-_-_____-_-___-_-_-__m