ML20246F307
| ML20246F307 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/07/1989 |
| From: | NRC |
| To: | |
| Shared Package | |
| ML20246F310 | List: |
| References | |
| NUDOCS 8907130213 | |
| Download: ML20246F307 (1) | |
Text
__ _--_ ___ __ _ _ _ _
s g.
REVISED 7/7/89 REGULATING CEA INSERTION LIMITS LIMITING CONDITION FOR OPERATION (Continued)
ACTION: (Continued) b)
Both CEAC's Inoperable Be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
~
b.
With the regulating CEA groups inserted between the Long Term Steady State Insertion Limits and the Transient Insertion Limits for inter-vals greater than 5 EFPD per 30 EFPD interval or greater than 14 EFPD p.r 18 Effective Full Power Months, either:
1.
Restore the regulating groups to within the Long Term Steady State Insertion Limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, or 2.
Be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
l c.
With the regulating CEA groups inserted between the Short Term Steady State Insertion Limits and the Transient Insertion Limits for intervals > 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> interval, operation may proceed provided any subsequent increase in THERMAL POWER is restricted to 5 5% of RATED THERMAL POWER per hour.
SURVEILLANCE REQUIREMENTS l
4.1.3.6 The position of each regulating CEA group shall be determined to be within the Transient Insertion Limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> except during time intervals when the_ PDIL Auctioneer Alarm Circuit is inoperable, or both CEAC's are inoperable, then verify the CEA group positions at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
The accumulated times during which the regulating CEA groups are inserted beyond the Long Term Steady State Insertion Limits but within the
~
Transient Insertion Limits shall be determined at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
I 8907130213 890707
~
PDR ADOCK 05000530 P
- See Special Test Exceptions 3.10.2 and 3.10.4.
- With K greater than or equal to 1.
- A reacfN power cutback will cause either (Case 1) Regulating Group 5 or I
Regulating Group 4 and 5 to be dropped with no sequential insertion of additional Regulating Groups (Groups 1, 2, 3, and 4) or (Case 2) Regulating Group 5 or Regulating Groups 4 and 5 to be dropped with all or part of the remaining Regulating Groups (Groups 1, 2, 3, and 4) being sequentially inserted.
In'either case, the Transient Insertion Limit and the withdrawal sequence of Figure 3.1-3 or Figure 3.1-4 can be exceeded for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
PALD VERDE - UNIT 3 3/4 1-30 AMENDMENT NO. 18
- _ __ _ _ _-__-_____ __ ________-____-_--_. _ _ - _ _ _ _ _ _ _ _ _ _ _ _ ___ _