Forwards Insp Repts 50-445/89-54 & 50-446/89-54 on 890706-0801.No Violations or Deviations Noted
ML20246E806
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/25/1989
From: Warnick R
Office of Nuclear Reactor Regulation
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20246E810 List:
References
NUDOCS 8908300028
Download: ML20246E806 (3)


See also: IR 05000445/1989054

Text

-_-

. _ .

_

,

c

.,

.~

'

AUG 251989

-

.

In Reply Refer To:

Dockets:

50-445/89-54

50-446/89-54

Mr. W. J. Cahill, Jr.

Executive Vice President

TU Electric

400 North Olive Street, Lock Box 01

Dallas, Texas

75201

Dear Mr. Cahill:

This refers to the inspection conducted by Mr. P. Stanish and an-

NRC consultant. during the period July 6 through August 1, 1989, of

activities authorized by NRC Construction Permits CPPR-126 and

CPPR-127 for the Comanche Peak Steam Electric Station, Units 1

and 2, and to the discussion of our findings with Mr. H. D. Bruner

and other members of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection.

Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the

inspectors.

Within the scope of the inspection, no violations or deviations

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

ORIGINIX 5!C'CD TY R. p. T77,n+:7C1'

R. F. Warnick, Assistant Director

4

for Inspect.on Programs

DnD

Comanche Peak Project Livision

l QCf

Office of Nuclear Reactor Regulation

SS

l mo

rnelosure:

Inspection Report 50-445/89-54; 50-446/89-54

'

eg

$$

c.o

cc w/ enclosure:

'

See next page

r

${E

IP:CPPDS!p'

AD:IP:CPPD:NRR

'y'q/IP:CPPD:NRR

,

,

ff4Livermore

RWarnick RFO)

"O

PS

nish'

8/

/89(

8 /51// 8 9

8/W /89

- _ _ - _ _ _ _ _ - _ _ _ _ _ _

_ _ _ - _ _ - - _ _ _ _ _ _ - _ _ _ _ - - _ _ _ - _ _ _ _ _ _ _ _ _ - - - _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _

_ - -

- - - - - -

.

--

- . - - - - _ _ _ - _ _ _ _ - . - _ , _ - _ _ - _ _ - _ _ _ -

_ _ - -

/'

, Mk fg

UNITED STATES

J*'

""__ [J,

g

~ NUCLEAR REGULATORY COMMISSION .

.y

e

wash NGTON D. C.90655

m

Es 25' E

.....

In Reply Refer To:

Dockets:

50-445/89-54-

50-446/89-54

'Mr. W. J._Cahille Jr.

Executive Vice President

I ' p.

TU' Electric.

C

400 North Olive Street, Lock Box 81

Dallas, Texas

75201

' Dear Mr. Cahill:

l

L

This refers.to the inspection conducted by Mr. P. Stanish and an

NRC consultant during the period July 6 through August 1,

1989, of-

activities authorized by NRC_ Construction Permits CPPR-126 and

CPPR-127 for the Comanche Peak Steam Electric Station, Units 1

,

and 2, and to.the discussion of our findings _with Mr. H. D. Bruner

and other members of your-staff at.the conclusion of the

inspection.-

The enclosed copy of our inspection report identifies areas

examined during the inspection.

Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the

inspectors.

Within the scope of the inspection, no violations or deviations

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

L

placed in-the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

I

be pleased to discuss them with you.

Sincerely,

RFIA)uwdek

-

l

R. F. Warnick, Assistant Director

E

for Inspection Programs

Comanche Peak Project Division

Office of Nuclear Reactor Regulation

Enclosure:

Inspection Report 50-445/89-54; 50-446/89-54

cc w/ enclosure:

see next page

- _ _ _

. _ _ - - _ _ - - -

l

_ _ - _ - _ - _ - . _

_

_

_

._

E

,

' W. JI Cchille Jr.

l

'

'

l

i

te w/ enclosure:

Roger D Walker

TU Electric

Manager, Nuclear Licensing

c/o Bethesda Licensing

TV Electric

3 Metro Center, Suite 61C

Skyway Tower

Bethesda, Maryland

20814

400 North Olive Street, L.B.

81

Dallas, TX

75201

E. F. Ottney

P. O.-Box 1777

Juanita Ellis

Glen Rose, Texas

76043

President - CASE

1426 South Polk Street

Jack R. Newman

Dallas, TX

75224

Newman & Holtzinger

1615 L Street, NW

Texas Radiation Control

Suite 1000

Program Director

Washington, DC

20036

Texas Department of Health

1100 West 49th Street

Ceorge R. Bynog

Austin, Texas

78756

Program Mgr./ Chief Inspector

Texas Dept. of Labor & Standards

R

GDS Associates, Inc.

Boiler Division

1850 Parkway Place, Suite 720

P.O. Box 12157, Capitol Station

Marietta, GA

30067-8237

Austin, Texas

78711

Honorable George Crump

County Judge

Glen Rose, Texas

76043

Ms. Billie Pirner Garde, Esq.

Garde Law Office

104 East Wisconsin Avenue

Appleton, WI

54911

Regional Administrator, Region IV

U.S. Nuclear Regulatory Commission

,

611 Ryan Plaza Drive, Suite 1000

/

Arlington, Texas

76011

William A. Burchette, Esq.

Counsel for Tex-La Electric

Cooperative of Texas

Heron, Burchette, Ruckert & Rothwell

1025 Thomas Jefferson St., NW

Washington, DC

20007

3