Forwards Portion of Rev 1 to TMI-2 Defueling Completion Rept Which Provides Basis for Determining That Defueling Activities in Reactor Bldg Completed
ML20246E088
Person / Time
Site: Crane 
Issue date: 08/18/1989
From: Roche M
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20246E093 List:
References
4410-89-L-0078, 4410-89-L-78, NUDOCS 8908290007
Download: ML20246E088 (2)


Text

~..

p..

I GPU Nuclear Corporation Nuclear

=?=ss-o Middletown, Pennsylvania 17057-0191 717 944-7621 TELEX 84 2386 Writer's Direct Dial Number:

(717) 948-8400 August 18, 1989 4410-89-L-0078/0477P 1

i US Nuclear Regulatory Commission Washington, DC 20555 ATTN: Document Control Desk Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 Defuelirg Completion Repnrt, Lecond Submittal l

l

Dear Sirs:

GPU Nuclear letter 4A10-89-L-0070, dated Julf 5,1969, transmitted the initial i

submittal of the Defueliry;l Completion Report (DCR) which included the basis for determining that defueling activities in the Auxiliary ard Fuel Handling Buildings (AFHB) have been completed..The letter also stated that subseouent submittals, forwarded as fuel removal activities are completed, would provide 4

the basis for concluding that defueling has been cumpleted in the Reactor Building (RB), the Reactor Coolant System (RCS), and the Reactor Vessel (RV).

j Attached, in part, is that portion of the DCR which provides the basis for determining that defueling activities in the RB have been completed (i.e.,

Section 5.2).

The amount of residual fuel in the RB has been demonstrated to l

be less than 88 kg which is significantly below the Safe Fuel Mass Limit and a l

l very small fraction of the defueling endpoint goal.

This submittal also includes minor corrections in previously submitted l

sections of the DCR which are annotated by change bars in the margin. Changed

)

pages and the new material submitted herein are indicated as Revision 1 to the initial submittal of the DCR.

Sincerely,

)

1 bh 8908290007 890s18 PDR ADOCK 05000320 M. B. Roche P

FDC Director, TMI-2

[$0/

f a

RDW/ emf f

(

b i

GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

.y Document Control Desk August 18, 1989 4410-89-L-0078 Attachment cc:

W. T. Russell - Regional Administrator, Region I J. F. Stolz - Director, Plant Directorate I-4 L. H. Thonus - Project Manager, TMI Site F. I. Young - Senior Resident Inspector, TMI i

l

.-_-- --___