ML20246D754

From kanterella
Jump to navigation Jump to search
Requests 45-day Extension Until 890825 to Respond to Generic Ltr 89-06,Task Action Plan Item I.D.2, SPDS, to Allow Comprehensive & Auditable Documentation to Be Generated
ML20246D754
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/05/1989
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0737, RTR-NUREG-1342, RTR-NUREG-737, TASK-1.D.2, TASK-TM 1683, GL-89-06, GL-89-6, NUDOCS 8907110415
Download: ML20246D754 (1)


Text

- _. _ _ _ _ - - _ _. _

l1

  • d ';

V* s l~

)

TOLEDO EDISON A Centenor Erwegy Cmqasy DONAU] C. SHELTON a

Vos Presdent-Nxhar Docket Number 50-346 License Number NPF-3 Serial Number 1683 T

July 5, 1989 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C.

20555 Subj ect: Task Action Plan Item I.D.2 - Safety Parameter Display System -

10CFR50.54(f) - (Generic Letter Number 89-06), Response Extension Gentlemen:

The Nuclear Regulatory Commission (NRC) by Generic Letter Number 89-06 (Log Number 2927, requested TE to furni.2h a 100FR50.54(f) certificatica of the implementation status of the Safety Parameter Display System (SPDS) at the Davis-Besse Nuclear Power Station (DBNPS), Unit Number 1.-

The Generic Letter, which was issued by the NRC on April 12, 1989, and received by Toledo Edison (TE) on May 11, 1989, requested that this certification be provided within 90 days of the date of Generic Letter Number 89-06.

i In order to provide the necessary certification, TE vill require a 45 day extension until August 25, 1989. This vill allow comprehensive and auditable documentation to be generated which will certify the status of the DBNPS SPDS in response to the Generic Letter.

If you have any questions concerning this matter, please contact Mr. R. V. Schreuder, Nuclear Licensing Manager, at (419) 249-2366.

Very trul yours, RMC/dlm cc:

P. M. Byron, DB-1 NRC Senior Resident Inspector A. B. Davis, Regional Administrator, NRC Region III j cx3 T. V. Vambach, DB-1 NRC Senior Project Manager 8907110415 990705 D

PDR ADOCK 05000346 P

PDC THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 i