ML20246D689
Jump to navigation
Jump to search
| ML20246D689 | |
| Person / Time | |
|---|---|
| Issue date: | 03/15/1989 |
| From: | Zech L NRC COMMISSION (OCM) |
| To: | Sharp P HOUSE OF REP., ENERGY & COMMERCE |
| Shared Package | |
| ML20246D630 | List: |
| References | |
| CCS, MARKEY-890315, NUDOCS 8907110395 | |
| Download: ML20246D689 (1) | |
Text
. _ _ _ _ -
1
.,4 00ESTION 12.
I unoerstand that the new designs are generally small6r than the current generation--between 150 and 600 megawatts as opposed to 1200 megawatts. Are these advanced reactors going to cost more per megawatt of electricity they produce than.the current generation?-
ANSWER The NRC has not reviewed the power generation costs associated with the new designs.
l l
l l
l l
8907110395 690502 PDR COMMS NRCC CORRESPONDENCE FDC L _
_-_______ -_________-__ _ ____ ____ __.