l 00ESTION 7.
You indicatea that preliminary design approval for MHTGR would be completed by 1992, based-on projected schedules provided by 00E. Has NRC conducted any detailed p
examination of these projected schedules? If so, do you i
think they are realistic, or do you believe PDA may be delayed?
ANSWER NRC has not conducted any detailed examination of the DOE projected scheoules for the PHTGR. The cates quoted are those developed by 00E.