ML20246D090

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-348/89-09 & 50-364/89-09 on 890410-14.No Violations or Deviations Noted.Unresolved Item Discussed in Rept
ML20246D090
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/25/1989
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
Shared Package
ML20246D093 List:
References
NUDOCS 8905100116
Download: ML20246D090 (2)


See also: IR 05000348/1989009

Text

"

=

'

.

'

'

f

a

APR 251889

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

)

Alabama Power Company 1

ATTN: Mr. W. G. Hairston, III

Senior Vice President-Nuclear

Operations

\ i

P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT: NRC INSPECTION REPORT N05. 50-348/89-09 AND 50-364/89-09 j

1

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by 1

R. W. Newsome and W. P. Kleinsorge on April 10-14, 1989. The-inspection

i included a review of activities authorized for your Farley facility. At the

l conclusion of the inspection, the findings were discussed with those members of 1

l your staff identified in the enclosed Inspection Report.

l

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

,

Within the scope of the inspection, no violations or deviations were {

identified.

l

Your attention is invited to the unresolved items identified in the Inspection j

, Report. These matters will be pursued during future inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter,-please contact us.

l

SincereA, -

ES 1

mm

.

Caudie A. Julian, Chi f

Engineering Branch

Division of Reactor Safety

cc w/ encl: (F a page 2)

g \ l

8905100116 690425 I

PDR ADOCK 05000348 .

-_ _ _ _ _ _ _ _ _ _ _ _ _ - _ -

-

.

APR 251989

Alabama Power Company 4

cc w/ encl:

B. M. Guthrie, Executive Vice President

D. N. Morey, General Manager -

Nuclear Plant

J. D. Woodard, Vice President -

Nuclear Generation

J. W. McGowan, Manager-Safety Audit

and Engineering Review

S. Fulmer, Supervisor-Safety

Audit and' Engineering Review

State of Alabama

bec w/ encl:

NRC Resident Inspector

DRS Technical Assistant

l E. Reeves, Project Manager, NRR

Document Control Desk

,

i

R, RII

RNewsome:td Iake FCafitrel1

04/lb /89 4/C ff89 04/J/89

L_----------_--