ML20246C261

From kanterella
Jump to navigation Jump to search
Forwards Public & Central Files Versions of Revised Epips, Including Revs 3 to EPIP-OSC-17 & EPIP-OSC-19,Rev 7 to EPIP-EOF-10,Rev 8 to EPIP-EOF-11,Revs 11 to EPIP-TSC-1 & EPIP-RR-1 & Revs 8 to EPIP-RR-11 & EPIP-RR-17
ML20246C261
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/03/1989
From: Morris K
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19312B342 List:
References
LIC-89-632, NUDOCS 8907100305
Download: ML20246C261 (1)


Text

_ _ _ - _ _

l l

Omaha Public Power District 1623 Harney Omaha Nebraska 68102 2247 402/536-4000 July 3, 1989 LIC-89-632 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station PI-137 Washington, DC 20555

Reference:

Docket No. 50-285 Gentlemen:

SUBJECT:

Transmittal of Changes to the Emergency Plan Implementing Procedures Pursuant to 10 CFR 50, Part 50.54(q), six (6) controlled copies of changes to the Fort Calhoun Station are being provided. Two (2) copies (control copy number 165) are provided, one for document control and one for the public document room with privacy information excluded. Three (3) copies (control copy numbers 154, 155 and 156) have been provided to the Regional Office In Arlington, Texas; and one (1) copy (control copy number 56) has been provided to the NRC Resident office. A transmittal sheet is provided for each copy to confirm receipt of the serialized document.

It is requested that these sheets be completed and returned within five (5) days of receipt.

NOTE:

Procedures RR-18 and RR-24 contain Privacy Information.

Sincer)ely, 4

.. orris D' vision Manager Nuclear Operations KJM/jak Er. closures c: LeBoeuf, Lamb, Leiby & MacRae w/o R. D. Martin, NRC Regional Administrator

[OYf A. Bournia, NRC Project Manager w/o P. H. Harrell, NRC Senior Resident Inspector j pc<s886 j

W Ip,l 8907100305 890703 gDR ADOCK 0500

  • 5 O

sMC fGd fpg Jg,g,en nstC n g

,u n u o,ay s... u w,mm