Forwards 11th Quarterly Update to Unit 2 Startup Rept.One Test Not Completed.Addl Quarterly Updates to Startup Rept Will Be Submitted as Required by Tech Specs
ML20246C225
Person / Time
Site: Catawba 
Issue date: 08/15/1989
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8908240290
Download: ML20246C225 (2)


Text

,.

, Ji?

~ [ Z- -

[

~

~ - ~ - - ~ ~ ~ ~ ~ ~ ~ - ~ ' '

't.'_

l.j

' ' l' y...

.g"$liRak l

DUKE POWER GoMPDT p.o. Box 33189 -

j t

g y cnAnLOTrE, N.c. 28242 '

"HALB. TUCKER-

' EW3R PERSEDENT

.(704) 373-4831'

.: pcc3.RA3 FeatymtJOTH3N -7 t

r A

August' 15,'1989 ~

Document Control Desk' Nuclear Regulatory Commission Washington. D.C.

20555

Subject:

Catawba _ Nuclear Station,~ Unit 2 Docket No. 50-414 Eleventh Quarterly Update to Startup Report

- Gentlemen:

.In accordance'with Section 6.9.1.3'of the Catawba Nuclear Station Technical' Specifications,_please find attached the eleventh quarterly update to'the Uniti2.:

Startup_ Report.

As. indicated in my May 15, 1989 letter to NRC, one test is not

' complete. Additional quarterly updates to the Startup Report will be submitted as required by. Technical Specifications.

Very truly yours,

~

jidkm l

Hal

. Tucker-JGT12.D1/lcs Attachment, xc:

M. L. Ernst, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. W. T. Orders l.

NRC Resident Inspector Catawba Nuclear Station l~

j..t

'8908240290 890815 Ig%

l '

PDR ADOCK 05000414 PDC R-t

_r_:___.______..___..__1_

_.________._____1___.

>x ? ey: : ;. o b

in.

1 e

u.

1 (C

STARTUP REPORT-QUARTERLY UPDATE

-CATAWBA UNIT 2 CYCLE l' August. 15, 1989 l

l l?

TESTING COMPLETED DURING QUARTER None.

w.

STATUS OF TESTING NOT COMPLETE-STEADY STATE PIPING SYSTEMS:0PERATIONAL VIBRATION MEASUREMENT - TP/2/A/1200/21 This test: is described in Section 10.5 and 11.5 in the Startup' Report.

It is complete'except for. retesting of piping associated with the Diesel l Generator Fuel

-Oil.and Lube 0il systems. Additional restraints were installed-during the EOC-1

. refueling outage. However, further modifications have been found to be-'

necessary. These modifications. involve the' replacement'of rigid' elbows with flexible elbows. Design _ Engineering is currently evaluating sources of. qualified :

parts. It has been determined by Design Engineering-that a Nuclear Station Modification will be necessary to perform this. piping replacement. Completion off the test is dependent.on these modifications.

It is expected these modifications

.will be completed during the Unit 2 End of Cycle 3; outage. This outage is currently scheduled to start in June, 1990.