Forwards 11th Quarterly Update to Unit 2 Startup Rept.One Test Not Completed.Addl Quarterly Updates to Startup Rept Will Be Submitted as Required by Tech Specs
ML20246C225
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 08/15/1989
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8908240290
Download: ML20246C225 (2)


Text

~ [ Z- -

- ~ ' - - - -

~ - ~ - - ~ ~ ~ ~ ~ ~ ~ - ~ ' '

, Ji? ,

[

l.j 't.'_

' ' l' y . ..

.g"$liRak ,

l DUKE POWER GoMPDT t p.o. Box 33189 -

g jy cnAnLOTrE, N.c. 28242 '

"HALB. TUCKER-

' EW3R PERSEDENT

.: pcc3.RA3 FeatymtJOTH3N -7

.(704) 373-4831' t r A

August' 15,'1989 ~

, Document Control Desk' Nuclear Regulatory Commission Washington. D.C. 20555

Subject:

Catawba _ Nuclear Station,~ Unit 2 Docket No. 50-414 Eleventh Quarterly Update to Startup Report

- Gentlemen:

.In accordance'with Section 6.9.1.3'of the Catawba Nuclear Station Technical' Specifications,_please find attached the eleventh quarterly update to'the Uniti2.:

Startup_ Report. As. indicated in my May 15, 1989 letter to NRC, one test is not

' complete. Additional quarterly updates to the Startup Report will be submitted as required by. Technical Specifications.

Very truly yours, jidkm

~

l -

Hal . Tucker-JGT12.D1/lcs Attachment, xc: M. L. Ernst, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. W. T. Orders

l. NRC Resident Inspector

! Catawba Nuclear Station l~

j..t.

l' '8908240290 890815 , Ig%

PDR ADOCK 05000414 R- PDC ' t

_r_:___.______..___..__1_ _.________._____1___. _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ . . . _ _ _ _

>x b

? ey: : ;. o in . 1 e ,;  :.

u.

1 ,

STARTUP REPORT-QUARTERLY UPDATE (C '

-CATAWBA UNIT 2 CYCLE l' August. 15, 1989 l

l l? TESTING COMPLETED DURING QUARTER None.  ;

w.

STATUS OF TESTING NOT COMPLETE-STEADY STATE PIPING SYSTEMS:0PERATIONAL VIBRATION MEASUREMENT - TP/2/A/1200/21 This test: is described in Section 10.5 and 11.5 in the Startup' Report. It is complete'except for. retesting of piping associated with the Diesel l Generator Fuel

-Oil.and Lube 0il systems. Additional restraints were installed-during the EOC-1

. refueling outage. However, further modifications have been found to be-' .

necessary. These modifications. involve the' replacement'of rigid' elbows with flexible elbows. Design _ Engineering is currently evaluating sources of . qualified :

parts. It has been determined by Design Engineering-that a Nuclear Station Modification will be necessary to perform this. piping replacement. Completion off the test is dependent.on these modifications. It is expected these modifications

.will be completed during the Unit 2 End of Cycle 3; outage. This outage is currently scheduled to start in June, 1990.